Exam 9: Layout Strategies

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

One guideline for a retail layout is to locate high-draw items around the periphery of the store.

(True/False)
4.7/5
(40)

McDonald's "Made by You" kitchen system represents a strategic layout decision even though an obvious benefit of the system is a dramatic reduction in the inventory of food prepared in advance.

(True/False)
4.8/5
(40)

Four hundred and eighty minutes of production time are available per day. Scheduled production is 120 units per day. What is the required cycle time?

(Multiple Choice)
4.9/5
(32)

Which of the following requires an information system that provides inbound product identification, its destination, and routing of the product to the designated outbound vehicle?

(Multiple Choice)
4.9/5
(35)

One drawback of a product-oriented layout is that work stoppage at any one point ties up the whole operation.

(True/False)
4.9/5
(38)

What is cross-docking? Why is it appropriate for some forms of warehouse layout?

(Essay)
4.9/5
(38)

The objective of layout strategy is to develop an effective and efficient layout that will meet the firm's competitive requirements.

(True/False)
4.9/5
(34)

Which type of layout is specifically designed to encourage employees to interact?

(Multiple Choice)
4.8/5
(39)

A hospital's layout most closely resembles which of the following?

(Multiple Choice)
4.9/5
(35)

In the Office Relationship Chart, which rating reflects the highest importance for two departments' closeness to each other?

(Multiple Choice)
4.8/5
(44)

A production line is to be designed for a product whose completion requires 21 minutes of work. The factory works 400 minutes per day. Can an assembly line with five workstations make 100 units per day?

(Multiple Choice)
4.8/5
(39)

A focused work center is well suited to the production of a large family of products requiring similar processing, even if their demands are not very stable.

(True/False)
4.7/5
(40)

A production line is to be designed for a job with four tasks. The task times are 2.4 minutes, 1.4 minutes, 0.9 minutes, and 1.7 minutes. After line balancing, the longest possible assigned task time is ________ and the shortest possible assigned task time is ________ minutes.

(Multiple Choice)
4.9/5
(43)

A manufacturing work cell has a takt time of 8.5 minutes and is staffed by 12 workers. If the work cell delivers 92 units each day find A. The total operation time B. The amount of time worked during the day for all 10 workers combined C. If the plant is open for only 8 hours per day, can the staff meet demand?

(Essay)
4.8/5
(36)

Cyclone Appliances has developed a new European-style convection oven that will be made on an assembly line. The schedule requires 80 ovens in an 8-hour day. The assembly includes seven tasks. The table below indicates the performance time and the sequence requirements for each task. Task Performance Time (minutes) Task must follow Task listed below A 1 B 2 A C 3 B D 2 B E 4 C, D F 1 E G 2 F a. What is the cycle time for this assembly operation? b. What is the theoretical minimum number of workstations? c. Draw the precedence diagram.

(Essay)
4.9/5
(34)

The major problem addressed by the process-oriented layout strategy is

(Multiple Choice)
4.8/5
(34)

A disadvantage of product-oriented layout is that

(Multiple Choice)
4.9/5
(37)

Cycle time is the maximum time that the product is allowed at each workstation.

(True/False)
4.9/5
(30)

CRAFT is software for balancing assembly lines.

(True/False)
4.8/5
(37)

Which layout type assumes an adequate volume for high equipment utilization?

(Multiple Choice)
4.9/5
(36)
Showing 21 - 40 of 171
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)