When suppliers are encouraged to locate near manufacturing plants, the goal of the JIT partnership is to reduce ________ inventory.

Free
(Short Answer)
5.0/5
(39)
Correct Answer:
Verified

in-transit

The 5S term ________ includes analysis to improve workflow and reduce wasted motion.

Free
(Short Answer)
4.9/5
(34)
Correct Answer:
Verified

simplify/straighten or simplify

Cross-training is a common JIT tactic to improve flexibility.

Free
(True/False)
4.9/5
(33)
Correct Answer:
Verified

True

Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of 12\frac { 1 } { 2 } a day. Each container (kanban) holds 1 cake. What is the correct number of kanbans?

(Multiple Choice)
4.8/5
(37)

The ________ is the time between the arrival of raw materials and the shipping of finished products.

(Short Answer)
4.9/5
(32)

Which one of the following is not a requirement of JIT systems?

(Multiple Choice)
4.7/5
(38)

A bakery uses 12 containers that hold 5 cakes. Daily demand is 14 cakes and safety stock is 6 cakes. What is the lead time?

(Short Answer)
4.7/5
(24)

Lead time for computers is 7 days with daily demand of 5 computers and a safety stock of 1 day. Each kanban holds 8 computers. What is the correct number of kanbans?

(Multiple Choice)
4.8/5
(35)

________ is any deviation from the optimum process that delivers perfect product on time, every time.

(Short Answer)
4.9/5
(35)

How are lean operations and the Toyota Production System (TPS) alike? How are they different?

(Essay)
4.9/5
(23)

Define variability within the context of JIT.

(Essay)
4.8/5
(30)

What is the time required to move orders through the production process, from receipt to delivery?

(Multiple Choice)
4.8/5
(34)

Identify JIT scheduling tactics.

(Essay)
4.7/5
(33)

A repetitive manufacturing firm is planning on level material use. The following information has been collected. Currently, the firm operates 250 days per year. Annual demand 22,000 Daily demand 88 Daily production 250 Desired lot size (2 hours of production) 63 Holding cost per unit per year \ 50 a. What is the setup cost, based on the desired lot size? b. What is the setup time, based on $40 per hour setup labor?

(Essay)
4.9/5
(33)

Daily usage of a product is 10 in a facility that operates every day of the year. Setup cost is $68 and annualized carrying cost is $100. Daily production of this product is 20. Lead time is 14 days; safety stock is one day's production. What is the optimum kanban size, and number of kanbans?

(Short Answer)
4.9/5
(41)

Waste is anything that does not add value, such as storage or inspection of items; waste also includes any activity that does not add value from the consumer's perspective.

(True/False)
4.7/5
(34)

Define manufacturing cycle time in the context of JIT systems.

(Essay)
4.8/5
(32)

TPS stands for Toyota Production System.

(True/False)
4.7/5
(41)

Which of the following is characteristic of lean operations?

(Multiple Choice)
4.9/5
(37)

Product storage is an example of waste, in the sense that no value is added.

(True/False)
4.9/5
(39)