Exam 18: Acceptance Sampling Plans
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
A double-sampling plan has a lower ________ than a single-sampling plan.
Free
(Short Answer)
4.9/5
(27)
Correct Answer:
ANI
average number of items inspected
Which one of the following actions will decrease the producer's risk?
Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
B
A single-sampling plan using a sample size of 50 on a lot size of 2,000 has the following performance:
Proportion Defective Probability of Acceptance 0.01 0.98 0.02 0.95 0.03 0.90 0.04 0.74 0.05 0.41 0.06 0.15
Today the company making the purchase receives two lots of 2,000 items and the inspection department is in a big hurry.Which action will result in an identical AOQL for the purchasing company?
Free
(Multiple Choice)
4.7/5
(38)
Correct Answer:
D
Champion Cooling Company has developed a sampling plan calling for a sample size of 25 and an acceptance number of 1.The proportion defective and probability of acceptance appear in the table.Floyd Electric,their supplier ships whatever Champion Cooling asks; sometimes the lot size is as small as 30 units and it has been as large as 10,000 units.Champion Cooling decides to stick with what they know,a sample size of 25 and an acceptance number of 1 despite advice to the contrary.Which statement regarding their sampling plan is best?
0.01 0.9980 0.02 0.9868 0.03 0.9620 0.04 0.9235 0.05 0.8729 0.06 0.8129 0.07 0.7466 0.08 0.6768 0.09 0.6063 0.10 0.5371
(Multiple Choice)
4.8/5
(39)
________ is an inspection procedure used to determine whether to accept or reject a specific quantity of material.
(Short Answer)
4.8/5
(39)
A single-sampling plan using a sample size of 50 has the following performance:
Proportion Defective Probability of Acceptance 0.01 0.98 0.02 0.95 0.03 0.90 0.04 0.74 0.05 0.41 0.06 0.15
If the plan is used on a lot of 2,000 items,what is the average outgoing quality limit?
(Multiple Choice)
4.8/5
(37)
The AOQ is often lower for a supplier with a high fraction defective than for a supplier with a comparatively lower fraction defective.Why wouldn't a supplier with a lower fraction defective always have a better AOQ?
(Essay)
4.8/5
(43)
Use Table I.1 for the following question.What is the acceptance number of a single-sampling plan if n = 300,LPTD = 0.02,and ? = 0.15?
(Multiple Choice)
4.9/5
(37)
A lot of 2,000 items has just arrived.A single sampling calls for a sample size of 100 and c = 3.What is the average outgoing quality limit,assuming that all defectives in the entire lot are replaced if it is rejected and all defectives are replaced in the sample if it is accepted? Table I.1 is appended to this exam.
(Multiple Choice)
4.8/5
(31)
Which one of the following alternatives will reduce the producer's risk for a given AQL and LTPD?
(Multiple Choice)
4.8/5
(36)
Increasing c while holding n constant decreases the ________ risk and increases the ________ risk.
(Short Answer)
4.8/5
(33)
A double-sampling plan has n? = 50,n? = 100,c? = 2,and c? = 4.Suppose the first sample revealed two defectives.What should be done?
(Multiple Choice)
4.9/5
(39)
An item is purchased with one surface polished to a specified finish quality.From each incoming shipment,a sample of items is randomly selected and the polished surface of each sample item is compared with a standard and judged to be either acceptable or unacceptable.The following parameters have been established: AQL = 0.02,= 0.05,LTPD = 0.09,and = 0.10.Table I.1 is appended to this exam.What are the sample size and the acceptance number?
(Multiple Choice)
4.8/5
(36)
Acceptance sampling is an inspection procedure used to determine whether to accept or reject a specific quantity of material.
(True/False)
4.8/5
(32)
A single-sampling plan has n = 200 and c = 6.A sample is taken and five items are found to be defective.What should be done?
(Multiple Choice)
4.8/5
(36)
n Producer's Risk (p=) Consumer's Risk (p=) 60 0.122 0.126 80 0.191 0.048 100 0.264 0.017 120 0.332 0.006
-A quality manager has established a sampling plan that calls for a sample size of 200 units and an acceptance number of 3.The supplier has agreed to a contract that calls for an AQL of 0.01 and an LTPD of .03.What is the producer's risk? Table I.1 is appended to this exam.
(Multiple Choice)
4.9/5
(26)
If you were interested in minimizing the average number of items inspected,which sampling plan would you choose? Why?
(Essay)
4.9/5
(28)
The chance that perfectly good material will be rejected based on a sample is known as a type I error.
(True/False)
4.9/5
(25)
Showing 1 - 20 of 71
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)