Exam 8: Managing Projects
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
The ________ is a statement of all work that has to be completed.
Free
(Short Answer)
4.7/5
(39)
Correct Answer:
work breakdown structure (WBS)
Deviations from the project plan are often referred to as ________.
Free
(Short Answer)
4.8/5
(26)
Correct Answer:
variances
The crash cost is the additional cost associated with reducing the time required to complete an activity in a project.
Free
(True/False)
4.9/5
(32)
Correct Answer:
False
A project has three paths.A-B-C has a length of 25 days.A-D-C has a length of 15 days.Finally,A-E-C has a length of 20 days.Which one of the following statements is TRUE?
(Multiple Choice)
4.8/5
(34)
In making an estimate of the most pessimistic time for an activity,a manager deliberately estimates this time too high (i.e.,longer than it should be).What is the result of this action,assuming the beta distribution is being used to make time estimates?
(Multiple Choice)
4.9/5
(34)
Table 3.9
All activity times for the project are in weeks.
Activity Optimistic Time Most Likely Time Pessimistic Time Immediate Predecessor(s) A 3 4 5 \@cdots B 5 7 9 - C 2 3 10 A D 2 5 8 B E 1 7 7 B F 3 5 7 C,D G 7 8 9 D,E H 2 6 10 F
-Using Table 3.9,what is the critical path of this project?
(Multiple Choice)
4.7/5
(28)
For controlling projects,the Cost Performance Index (CPI)measures the ratio of the budgeted cost of the work completed to date divided by the actual cost for that same work.
(True/False)
4.8/5
(34)
Resource allocation is an attempt to shift ________ from activities with slack to those on the critical path where resources are overloaded.
(Short Answer)
4.9/5
(29)
Of the four major phases in project life cycles,typically the execution stage requires the most resources.
(True/False)
4.9/5
(35)
Table 3.8
Activity Immediate Predecessor(s) Time (weeks) A \@cdots 3 B \@cdots 4 C A,B 5 D A 6 E 4 F , 2
-Using Table 3.8,what is the critical path of the above project?
(Multiple Choice)
4.9/5
(39)
________ is a measure of the probability and consequence of not reaching a defined project goal.
(Short Answer)
4.8/5
(42)
Total slack can be calculated as the difference between the latest start (LS)and earliest start (ES),or by the difference between the latest finish (LF)and earliest finish (EF).
(True/False)
4.8/5
(31)
Table 3.12
You are responsible for managing a project with the following activities (times are given in weeks).
Activity Expected Time Immediate Predecessor () 3 \@cdots- B 3 - C 5 A D 4 A,B E 4 B F 4 C,D G 3 , 5 ,
-Using Table 3.12,if the expected time for activity D is increased to 6 weeks,by how many weeks will the project's expected completion time increase?
(Multiple Choice)
4.7/5
(26)
When using the beta probability distribution to estimate activity times,which of the following statements is TRUE?
(Multiple Choice)
4.8/5
(44)
A project is an interrelated set of activities that has a definite starting and ending point.
(True/False)
4.8/5
(30)
Draw the network corresponding to the following information.Also,complete the table,identify the critical path,and specify project completion time.
Activity Immediate Predecessor(s) Time (Weeks) A \@cdots 3 B \@cdots 4 C A 6 D B 9 E B 6 F C,D 6 G , 8 , 9
Activity Earliest Start Earliest Finish Latest Start Latest Finish Slack
(Essay)
4.9/5
(41)
Network methods let project managers analyze the time and cost implications of resource trade-offs.
(True/False)
4.7/5
(37)
Table 3.13
You are responsible for managing a project with the following activities (times are given in weeks).
Activity Expected Time Immediate Predecessor () 8 \@cdots- B 10 - C 7 A,B D 5 B E 12 C F 7 C,D G 6 E,F H 10 F
-Using Table 3.13,if the expected time for activity E is decreased to 8 weeks,what is the new expected completion time for the project?
(Multiple Choice)
4.7/5
(22)
Showing 1 - 20 of 153
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)