Exam 5: Inventory Management
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
The net quantity of an item available to satisfy future demand is referred to as
Free
(Multiple Choice)
5.0/5
(35)
Correct Answer:
C
Sark Incorporated is out of stock for a key item,which has a backorder of 200 units.An open order of 750 units is scheduled for arrival on the following Monday.What is the current inventory position at Sark?
Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
C
The secondary levers for decoupling inventory emphasize
Free
(Multiple Choice)
4.7/5
(40)
Correct Answer:
D
Which one of the following statements concerning the economic order quantity (EOQ)model is TRUE?
(Multiple Choice)
4.9/5
(31)
Table 5.4
A company operating under a continuous review system has an average demand of 50 units per week for the item it produces. The standard deviation in weekly demand is 20 units. The lead time for the item is 6 weeks, and it costs the company $30 to process each order. The holding cost for each unit is $10 per year. The company operates 52 weeks per year. You will need to refer to a normal table to answer the question(s).
-Use the information in Table 5.4.What is the economic order quantity (EOQ)for this item?
(Multiple Choice)
4.9/5
(35)
The EOQ is the lot size that minimizes total annual inventory holding and ordering costs.
(True/False)
4.8/5
(29)
Table 5.11
The following information has been collected on an independent demand item:
Demand units per week (assume 52 weeks/ year)
Ordering and setup cost per order
Holding cost per unit per year
Lead time week
Standard deviation in weekly demand units
Cycle-service level
You will need to refer to a normal table to answer the question(s).
-Use the information from Table 5.11.Design a continuous review system (Q system)for this item,making Q equal to the EOQ.Assume that the demand during lead time is normally distributed.What are the desired values for Q and R?
(Multiple Choice)
4.9/5
(39)
Which one of the following descriptions best defines the cycle-service level as a measure of customer service?
(Multiple Choice)
4.8/5
(27)
The ________ is the measurement of an item's ability to satisfy future demand.
(Short Answer)
4.9/5
(38)
ABC analysis is the process of dividing items into ________ according to their dollar usage.
(Short Answer)
4.8/5
(37)
When using ABC analysis,class C items should be reviewed frequently.
(True/False)
4.9/5
(35)
Table 5.8
Demand units/year
Standard deviation of weekly demand units
Ordering costs order
Holding costs unit/year
Cycle-service level
Lead time weeks
Number of weeks per year weeks
You will need to refer to a normal table to answer the question(s).
-Use the information in Table 5.8.What is the EOQ for this item?
(Multiple Choice)
4.9/5
(31)
Explain the impact the following three changes would have for EOQ level; (i)increase in the annual demand,(ii)increasing setup costs,and (iii)increases in the holding costs.
(Essay)
4.9/5
(25)
The desired probability of not running out of stock in any one order cycle is referred to as the
(Multiple Choice)
4.8/5
(30)
Table 5.8
Demand units/year
Standard deviation of weekly demand units
Ordering costs order
Holding costs unit/year
Cycle-service level
Lead time weeks
Number of weeks per year weeks
You will need to refer to a normal table to answer the question(s).
-Use the information in Table 5.8.If the firm changed to a continuous review system,what would be the reorder point?
(Multiple Choice)
4.9/5
(35)
Table 5.2
Consider the following data for an independent demand item maintained by Vicki Crittenden, the proprietor of a local auto repair shop:
Weekly demand = 50 units
Ordering cost = $8/order
Holding cost = $4/order
Weeks in a year = 50
-Use the information in Table 5.2.If Crittenden uses the EOQ model,how frequently must she place orders for this item?
(Multiple Choice)
4.7/5
(34)
________ inventory is the inventory moving from point to point in the materials flow system.
(Short Answer)
4.8/5
(29)
Which one of the following statements regarding the economic order quantity (EOQ)is TRUE?
(Multiple Choice)
4.9/5
(31)
Showing 1 - 20 of 177
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)