Exam 9: Location and Layout
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
An advantage of ________ layouts is that they are less vulnerable to changes in product mix or new marketing strategies and are therefore more flexible.
Free
(Short Answer)
4.8/5
(31)
Correct Answer:
process
Table 9.1
A single facility is needed to meet the demands of four markets.
The locations and demands of these four markets are shown below.
Market Coordinates Demand (8,6) 10 (4,12) 15 (3,2) 10 (9,6) 6
-Use the information from Table 9.1.If the facility must be located at one of these four markets,which of the four locations is most desirable,assuming rectilinear distance?
Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
D
Table 9.19
The Illinois Appliance Company is installing a line to produce a vacuum cleaner, and you, as the operations manager, are responsible for designing the line. The line has to produce 30 units per hour. The work elements to be performed are as follows, with the time needed and immediate predecessor(s) also shown.
Work Element Time (sec) Immediate Predecessor(s) 55 -- B 45 25 20 40 50 70 45 , 20 80 ,
-The production of a product consists of seven work elements.The desired output rate is 2 units per minute.The work elements and their precedence relationships follow.
Work Element Time (sec) Immediate Predecessor(s) 1 15 -- 2 16 1 3 12 2 4 14 3 5 18 2,4 6 12 5 7 20 4
Using the longest work-element time method,how many stations are required?
Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
D
Table 9.6
Nuts-and-Bolts Inc. wishes to find the best location for a plant
that will satisfy customer demand in the following five areas.
Area Coordinates Demand (7,3) 30 (7,7) 40 (1,10) 45 (2,6) 15 (4,5) 25
-Use the information in Table 9.6.If the plant is located at the coordinates (3,7),what is the total load-distance score,assuming rectilinear distance?
(Multiple Choice)
4.9/5
(30)
The Hunan Restaurant wishes to locate a new facility.Based on the following subjective criteria,where should the new facility be located? (Very good=5,Good = 4,Fair = 3,Poor = 2,and Very poor = 1
Factor Score Evaluation by Location
Factor Weight A B C D Market 30 5 4 4 4 Labor Climate 25 2 5 4 3 Suppliers 25 3 4 3 5 Quality of Life 20 2 3 5 2
(Multiple Choice)
4.7/5
(34)
Which of the following is an advantage or characteristic of a process layout over a product layout when volumes are low?
(Multiple Choice)
4.7/5
(29)
Table 9.13
The Bigmoney Financial Company is designing its layout for a new office.
The following trip matrix was developed for daily trips between departments.
Trips Between Departments
-- 20 0 0 0 0 - 20 0 18 25 - 0 19 0 - 0 0 - 30 -
-Use the information from Table 9.13.All things equal,which two departments should be located closest together?
(Multiple Choice)
4.9/5
(38)
The point has been reached where a manufacturer's research and development center must expand by building a new facility.The search has been narrowed to five locations,all of which are acceptable to management.The assessment of these sites is being made on the basis of the five subjective location factors that follow.Management has agreed to use a five-point scale (Excellent = 5,and Poor = 1)to quantify and compare their subjective opinions about the relative goodness of the sites).The weight reflects the importance of each factor in the decision.
Locations
Factor Weight A B C D E Labor Climate 0.30 4 2 1 4 2 Proximity to Markets 0.30 5 3 3 4 4 Quality of Life 0.15 1 3 2 1 5 Proximity to 0.15 2 5 3 4 3 Suppliers 0.10 4 4 4 1 3 Taxes
Calculate the weighted score for each alternative.Which location would you recommend?
(Essay)
4.8/5
(33)
Table 9.23
The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The desired output for the line is 50 connectors per hour, and the information on the work elements for this assembly line is as follows.
Work Elements Time (sec) Immediate Predecessor(s) 40 -\cdot 36 20 2 30 , 34 35 5 15 , 40 38 ,,
-Use the information from Table 9.23,and the longest work-element rule to balance this line.What work elements are included in the first station?
(Multiple Choice)
4.9/5
(40)
Immediate predecessors are the smallest units of work that can be performed independently.
(True/False)
4.8/5
(37)
Table 9.20
The following information is known about an assembly line.
The desired output rate is 80 units per hour.
Work Element Time (sec) Immediate Predecessor () 1 1 -- 2 15 1 3 20 1 4 30 2 5 20 2,3 6 10 5 7 20 4 8 4 6,7
-Use the information in Table 9.20.Using the longest work-element time rule of line balancing,what is the theoretical minimum number of stations versus the number of stations needed?
(Multiple Choice)
4.8/5
(44)
A national drugstore chain prefers to operate one outlet in a town that has four major market segments.The number of potential customers in each segment,along with the location coordinates,are given below.
Market Segment Number of Customers 1 2 18 1200 2 15 17 700 3 2 2 1800 4 14 2 2500
Which would be the best location using the center of gravity method?
(Multiple Choice)
4.7/5
(34)
Table 9.9
The administration department of a small college is now designing its layout for newly built office space. From statistical samplings over the last three months, the following trip matrix was developed for daily trips between departments.
Trip Matrix (trips/day)
- 10 75 140 - 95 - 130 130 - 10 - 95 -
-Use the information in Table 9.9.Which switch of two offices within the department will improve the total load-distance score the most?
(Multiple Choice)
5.0/5
(29)
Build-It-Fast Inc.is analyzing the performance of its assembly line.Management observes that the line assembles 80 widgets per hour and that the total productive time needed to assemble one widget is 170 seconds.The assembly line currently has 6 stations.What is the efficiency of this line?
(Multiple Choice)
4.7/5
(34)
Table 9.14
The department of philosophy at a university in Oregon must allocate six faculty members to their new offices. The following trip matrix indicates the expected number of contacts per day made between professors. Also shown on the right is a sketch of the available office spaces (1 through 6) for the six faculty members. Assume equally sized offices. The distance between office 1 and office 2 (as well as the distance between office 1 and 3) is one unit of distance. Please measure by rectilinear distance.
Trips Between Departments
-- 0 4 0 0 0 - 0 12 0 10 - 2 7 0 - 0 4 - 0 -
Layout of Available Offices
1 2 3 4 5 6
-Use the information in Table 9.14.Because of their academic position Professor A must be assigned to office 1,Professor C must be assigned to office 2,and professor D must be assigned to office 6.What faculty members should be assigned to offices 3,4,and 5,respectively to minimize the total load-distance score? (Assume rectilinear distance)
(Multiple Choice)
4.9/5
(31)
Table 9.22
The production of a particular product consists of seven work elements. The desired output rate is 60 units per hour. The work element and their precedence relationships are given.
Work Element Time (sec) Immediate Predecessor(s) 1 30 -- 2 15 1 3 20 2 4 15 3 5 30 3 6 25 4 7 30 5,6
-Use the information in Table 9.22.Using the longest work-element time rule,how many stations are required?
(Multiple Choice)
4.8/5
(42)
The space in a bank where customers line up for teller service is not an economic activity centre.
(True/False)
4.8/5
(39)
Table 9.19
The Illinois Appliance Company is installing a line to produce a vacuum cleaner, and you, as the operations manager, are responsible for designing the line. The line has to produce 30 units per hour. The work elements to be performed are as follows, with the time needed and immediate predecessor(s) also shown.
Work Element Time (sec) Immediate Predecessor(s) 55 -- B 45 25 20 40 50 70 45 , 20 80 ,
-Use the information in Table 9.19.What is the theoretical minimum number of stations?
(Multiple Choice)
4.9/5
(33)
________ is the process of determining a geographic site for a firm's operations.
(Short Answer)
4.9/5
(34)
Showing 1 - 20 of 217
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)