A resource planning process takes

Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
Verified

A

________ is an inventory control and scheduling technique that applies MRP principles to distribution inventories.

Free
(Short Answer)
4.7/5
(34)
Correct Answer:
Verified

Distribution requirements planning
DRP

An intermediate item is a subassembly.

Free
(True/False)
5.0/5
(27)
Correct Answer:
Verified

True

What are the key inputs to an MRP system?

(Essay)
4.9/5
(27)

The underlying logic for level-by-level processing in an MRP system is

(Multiple Choice)
4.9/5
(42)

Timed phased product structure,unlike Bill of materials,adds the concept of lead times.

(True/False)
4.9/5
(42)

Table 13.6 Table 13.6    -Use the information from Table 13.6.If the lot-sizing rule were L4L instead of FOQ = 30 units,what would be the planned order release quantity week 1? -Use the information from Table 13.6.If the lot-sizing rule were L4L instead of FOQ = 30 units,what would be the planned order release quantity week 1?

(Multiple Choice)
4.7/5
(43)

MRP II ties MRP to the company's financial system.

(True/False)
4.7/5
(36)

Table 13.7 Table 13.7    -Use the information from Table 13.7.If a FOQ of 75 units is used,how many planned order releases are there for item XYZ? -Use the information from Table 13.7.If a FOQ of 75 units is used,how many planned order releases are there for item XYZ?

(Multiple Choice)
4.8/5
(42)

An action bucket is the first week's entry of the planned order release row.

(True/False)
4.8/5
(42)

MRP can be used to best advantage under which one of the following circumstances?

(Multiple Choice)
4.8/5
(42)

Faster response to market changes and reduced inventory levels are both benefits of MRP.

(True/False)
4.8/5
(37)

Explain why MRP does a better job of estimating the need to replenish inventory items than does the fixed order quantity system in a dependent demand environment.

(Essay)
4.8/5
(28)

Table 13.3 Consider the following MPS, BOM, and inventory data. You will need a blank MRP record to answer the question(s). Master Production Schedule: the following table shows the MPS start quantities. Week Week 1 2 3 4 5 6 A 50 80 100 B 60 100 Bill of Material -End item A uses 1 each of component C and 1 each of subassembly D. -Subassembly D uses 2 each of component E and 2 each of component F. -End item B uses 1 each of component C and 2 each of component F. Selected Inventory Data Item Data Category Lot-sizing rule A A =250 POQ (P = Lead time (wks) 3 1 3 2) Beginning (on-hand) 50 80 90 1 inventory 80( wk 1) None 250( wk 3) 30 Scheduled receipts wk 1) -Use the information in Table 13.3.Which one of the following statements about item C is TRUE?

(Multiple Choice)
5.0/5
(27)

In MRP,a(n)________ is an item that may go through one or more operations to be transformed into or become part of one or more parents.

(Short Answer)
4.8/5
(23)

Using a periodic order quantity generates a high level of average inventory because it creates inventory remnants.

(True/False)
4.9/5
(36)

For items manufactured in-house,one component of lead time is processing time.

(True/False)
4.7/5
(30)

________ systems are large,integrated information systems that support many enterprise processes and data storage needs.

(Short Answer)
4.9/5
(34)

________ demand occurs because the quantity required is a function of the demand for the other items held in inventory.

(Short Answer)
4.8/5
(38)

An action notice is a handwritten memo sent from the supervisor of the department to the line workers.