Exam 12: Resource Planning
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
________ is an inventory control and scheduling technique that applies MRP principles to distribution inventories.
Free
(Short Answer)
4.7/5
(34)
Correct Answer:
Distribution requirements planning
DRP
The underlying logic for level-by-level processing in an MRP system is
(Multiple Choice)
4.9/5
(42)
Timed phased product structure,unlike Bill of materials,adds the concept of lead times.
(True/False)
4.9/5
(42)
Table 13.6
-Use the information from Table 13.6.If the lot-sizing rule were L4L instead of FOQ = 30 units,what would be the planned order release quantity week 1?

(Multiple Choice)
4.7/5
(43)
Table 13.7
-Use the information from Table 13.7.If a FOQ of 75 units is used,how many planned order releases are there for item XYZ?

(Multiple Choice)
4.8/5
(42)
An action bucket is the first week's entry of the planned order release row.
(True/False)
4.8/5
(42)
MRP can be used to best advantage under which one of the following circumstances?
(Multiple Choice)
4.8/5
(42)
Faster response to market changes and reduced inventory levels are both benefits of MRP.
(True/False)
4.8/5
(37)
Explain why MRP does a better job of estimating the need to replenish inventory items than does the fixed order quantity system in a dependent demand environment.
(Essay)
4.8/5
(28)
Table 13.3
Consider the following MPS, BOM, and inventory data. You will need a blank MRP record to answer the question(s).
Master Production Schedule: the following table shows the MPS start quantities.
Week
Week 1 2 3 4 5 6 A 50 80 100 B 60 100
Bill of Material
-End item A uses 1 each of component C and 1 each of subassembly D.
-Subassembly D uses 2 each of component E and 2 each of component F.
-End item B uses 1 each of component C and 2 each of component F.
Selected Inventory Data
Item
Data Category Lot-sizing rule A A =250 POQ (P = Lead time (wks) 3 1 3 2) Beginning (on-hand) 50 80 90 1 inventory 80( wk 1) None 250( wk 3) 30 Scheduled receipts wk 1)
-Use the information in Table 13.3.Which one of the following statements about item C is TRUE?
(Multiple Choice)
5.0/5
(27)
In MRP,a(n)________ is an item that may go through one or more operations to be transformed into or become part of one or more parents.
(Short Answer)
4.8/5
(23)
Using a periodic order quantity generates a high level of average inventory because it creates inventory remnants.
(True/False)
4.9/5
(36)
For items manufactured in-house,one component of lead time is processing time.
(True/False)
4.7/5
(30)
________ systems are large,integrated information systems that support many enterprise processes and data storage needs.
(Short Answer)
4.9/5
(34)
________ demand occurs because the quantity required is a function of the demand for the other items held in inventory.
(Short Answer)
4.8/5
(38)
An action notice is a handwritten memo sent from the supervisor of the department to the line workers.
(True/False)
4.9/5
(35)
Showing 1 - 20 of 174
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)