Exam 7: Design for Quality and Product Excellence

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The idea generation phase of product development usually includes prototype testing,in which a model is constructed to test the product's physical properties or use under actual operating conditions.

Free
(True/False)
4.8/5
(31)
Correct Answer:
Verified

False

Describe the product/process development phase in a typical product development process.

Free
(Essay)
4.8/5
(34)
Correct Answer:
Verified

If an idea survives the concept stage -and many do not -the actual design process begins by evaluating design alternatives and determining engineering specifications for all materials,components,and parts.This phase usually includes prototype testing,in which a model (real or simulated)is constructed to test the product's physical properties or use under actual operating conditions,as well as consumer reactions to the prototypes.Concurrently,companies develop,test,and standardize the processes that will be used in manufacturing the product or delivering the service,which include selecting the appropriate technology,materials,and suppliers and performing pilot runs to verify results.

Which of the following symbols is used to denote a very strong relationship between any pair of technical requirements in a typical House of Quality?

Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
Verified

D

_____ is the process of designing a product for efficient production at the highest level of quality.

(Multiple Choice)
4.8/5
(43)

Which of the following activities included in the DMADV process gathers the voice of the customer,identifies the vital characteristics that are most important to customers,and outlines the functional requirements of the product that will meet customer needs?

(Multiple Choice)
4.8/5
(41)

What is the mission and philosophy of Shure Inc.?

(Essay)
4.7/5
(36)

In the context of manufacturing specifications,the term "tolerance" refers to:

(Multiple Choice)
4.7/5
(35)

One of the most significant barriers to efficient product development is the adaption of concurrent engineering within an organization.

(True/False)
4.7/5
(37)

The axiomatic design method of product development tends to lessen design time.

(True/False)
5.0/5
(37)

Which of the following phases of product development usually includes prototype testing?

(Multiple Choice)
4.9/5
(41)

Narrow tolerances in product design tend to raise manufacturing costs and also increase the interchangeability of parts within the plant and in the field,product performance,durability,and appearance.

(True/False)
4.9/5
(44)

_____ is seeing things in new or novel ways.

(Multiple Choice)
4.9/5
(32)

In practice,product design reliability is determined by the number of failures per unit time during the duration under consideration.

(True/False)
4.9/5
(34)

_____ is a process in which all major functions involved with bringing a product to market are continuously involved with product development from conception through sales.

(Multiple Choice)
4.8/5
(42)

Which of the following activities included in the DMADV process is focused on concept development from engineering and aesthetic perspectives and often includes the creation of drawings,virtual models,or simulations to develop and understand the functional characteristic of the product?

(Multiple Choice)
4.8/5
(34)

The DMADV process incorporates the principal activities of the design for six sigma.Which of the following activities included in DMADV focuses on identifying and understanding the market need or opportunity?

(Multiple Choice)
4.9/5
(35)

New ideas are studied for feasibility in the _____ phase of product development.

(Multiple Choice)
4.9/5
(33)

The managed care organizations (MCOs)used the QFD process to redesign their handbook.List the steps followed by the focus groups in giving input for this QFD process.

(Essay)
4.9/5
(32)

Which of the following activities of the design for six sigma (DFSS)ensures that the quality level and reliability requirements of the product are achieved?

(Multiple Choice)
4.9/5
(32)

The predicted reliability determined by the design of the product or process is called the _____ reliability.

(Multiple Choice)
4.7/5
(31)
Showing 1 - 20 of 80
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)