Exam 15: Process Improvement Using Control Charts
Exam 1: An Introduction to Business Statistics63 Questions
Exam 2: Descriptive Statistics: Tabular and Graphical Methods100 Questions
Exam 3: Descriptive Statistics: Numerical Methods141 Questions
Exam 4: Probability127 Questions
Exam 5: Discrete Random Variables150 Questions
Exam 6: Continuous Random Variables145 Questions
Exam 7: Sampling and Sampling Distributions131 Questions
Exam 8: Confidence Intervals149 Questions
Exam 9: Hypothesis Testing150 Questions
Exam 10: Statistical Inferences Based on Two Samples139 Questions
Exam 11: Experimental Design and Analysis of Variance98 Questions
Exam 12: Chi-Square Tests112 Questions
Exam 13: Simple Linear Regression Analysis140 Questions
Exam 14: Multiple Regression and Model Building150 Questions
Exam 15: Process Improvement Using Control Charts117 Questions
Select questions type
In 25 samples of 100 units each,75 units were found to be defective.Find the appropriate UCL and LCL for the p chart.
(Multiple Choice)
4.9/5
(33)
In a manufacturing process,if the limits for a control chart are set too _____________,the risk of unnecessarily tampering with the process ____________.
(Multiple Choice)
4.7/5
(33)
If
= .0139 and 25 shipments of 20 items each were examined,what are the UCL and the LCL for the p chart?

(Multiple Choice)
4.7/5
(37)
How well a process is able to meet the requirements set forth by the process design is called:
(Multiple Choice)
4.8/5
(25)
When using
and R charts to analyze and improve a process,first,the
chart is analyzed and the necessary action(s)to correct assignable causes of variation is (are)taken before the R chart is analyzed.


(True/False)
4.9/5
(34)
Suppose that
and R charts based on subgroups of size 4 are being used to monitor the tire diameter of a new radial tire.The
andR charts are found to be in statistical control,with
inches.A histogram of the tire diameter measurements indicates that these measurements are approximately normally distributed.Compute the natural tolerance limits for this process.



(Multiple Choice)
4.8/5
(39)
An
chart is a control chart on which individual process measurements are plotted versus time.

(True/False)
4.7/5
(43)
Use this information about 10 shipments of lightbulbs:
If 400 bulbs are selected at random from each of 10 shipments and the number of defectives in each shipment is given above,find the appropriate center line.

(Multiple Choice)
5.0/5
(31)
A p chart is a control chart on which the proportions of nonconforming units are plotted versus time.
(True/False)
4.8/5
(36)
If 20 samples of size 7 are drawn,with
= 33.33 and
= 5.65,what are the LCL and UCL for the R chart?


(Multiple Choice)
4.9/5
(33)
For a manufacturing process,
= 10 inches,
= .4 inches,and the subgroup sample size is 6 units.Calculate the standard control limits for the R chart.


(Multiple Choice)
4.9/5
(40)
A motorcycle manufacturer produces the parts for its vehicles in different locations and transports them to its plant for assembly.To keep the assembly operations running efficiently,it is vital that all parts be within specification limits.One important part used in the assembly is the engine camshaft,and one important quality characteristic is the case hardness depth.Specifications state that the hardness depth must be between 3.0 mm and 6.0 mm.To investigate the process,the quality control engineer selected 25 daily subgroups of n = 5 and measured the hardness depth.The process yielded a mean of the means
= 4.50 and an average range = 1.01.Calculate the center line for the X-bar chart.

(Multiple Choice)
4.8/5
(39)
A motorcycle manufacturer produces the parts for its vehicles in different locations and transports them to its plant for assembly.In order to keep the assembly operations running efficiently,it is vital that all parts be within specification limits.One important part used in the assembly is the engine camshaft,and one important quality characteristic is the case hardness depth.Specifications state that the hardness depth must be between 3.0 mm and 6.0 mm.To investigate the process,the quality control engineer selected 25 daily subgroups of n = 5 and measured the hardness depth.The process yielded a mean of the means
= 4.50 and an average range = 1.01.Assuming that the process is in statistical control,calculate the natural tolerance limits for the process.

(Multiple Choice)
4.8/5
(28)
The quality of an electronic component used in manufacturing cell phones is monitored with a p chart.In the last 20 days,daily samples of 75 units resulted in the following number of defective units per sample: 8,4,3,7,3,1,0,7,4,2,0,1,6,2,4,3,1,2,8,and 5.Find the appropriate center line.
(Multiple Choice)
4.9/5
(37)
A powder metal manufacturing company is producing sleeves for a locking mechanism.The target (nominal)value for the inside diameter is 1 inch.The inside diameter specifications are 1 ± .005 inches.Assume that the process is in statistical control with
= 1.0002 inches,
= .003 inches,and subgroup size of 5.What is the sigma level capability for this process?


(Multiple Choice)
4.8/5
(36)
Common causes of variation represent the inherent variability of a given process.
(True/False)
4.8/5
(37)
How well a product or service performs in the marketplace is called:
(Multiple Choice)
4.8/5
(33)
Showing 101 - 117 of 117
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)