Exam 8: Facility and Work Design
Exam 1: Operations Management and Value Chains48 Questions
Exam 2: Measuring Performance in Operations and Value Chains35 Questions
Exam 3: Operations Strategy38 Questions
Exam 4: Technology and Operations Management25 Questions
Exam 5: Goods and Service Design40 Questions
Exam 6: Supply Chain Design32 Questions
Exam 7: Process Selection, Design, and Analysis30 Questions
Exam 8: Facility and Work Design31 Questions
Exam 9: Forecasting and Demand Planning35 Questions
Exam 10: Capacity Management34 Questions
Exam 11: Managing Inventories in Supply Chains36 Questions
Exam 12: Supply Chain Management and Logistics25 Questions
Exam 13: Resource Management25 Questions
Exam 14: Operations Scheduling and Sequencing23 Questions
Exam 15: Quality Management38 Questions
Exam 16: Quality Control and SPC25 Questions
Exam 17: Lean Operating Systems26 Questions
Exam 18: Project Management26 Questions
Select questions type
__________usually require a high level of planning and control compared with other types of facility layouts.
Free
(Multiple Choice)
4.7/5
(42)
Correct Answer:
D
Which of the following is true of a cellular layout
Free
(Multiple Choice)
4.9/5
(29)
Correct Answer:
C
One of the advantages of a product layout is that it:
Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
B
FancyTrends Inc., a handbag manufacturing company, assembles handbags in an assembly line using 10 workstations. The target output for an 8 hour workday is 120 bags. The sum of the task times is 30 minutes/bag. The cycle time is 4 minutes/bag. The assembly-line efficiency is _____.
(Multiple Choice)
4.9/5
(34)
An assembly line with 30 activities is to be balanced. The total amount of time required for all 30 activities is 45 minutes. The line will operate for 420 minutes per day. Which of the following must be the cycle time to achieve an output rate of 300 units/day
(Multiple Choice)
4.8/5
(31)
Megan plans the facility layout of her new shop that would sell a variety of healthcare industry machines. She arranges the machines in a way that the machines are grouped according to their functions. Which of the following types of facility layouts has Megan used in her shop
(Multiple Choice)
4.8/5
(35)
One of the differences between product layouts and process layouts is that unlike product layouts, process layouts:
(Multiple Choice)
4.8/5
(45)
Identify the most suitable layout for a facility that handles a wide variety of customized orders.
(Multiple Choice)
4.7/5
(30)
According to a study conducted by Software Advice, the likelihood of consumers buying a particular product remains unaffected even when the production of that product causes reduced environmental impact.
(True/False)
4.9/5
(44)
Research has shown that bringing the outdoor environment into the workplace lowers stress.
(True/False)
4.8/5
(36)
In a cellular layout, additional floor space is required because machines are not very closely linked within a cell.
(True/False)
5.0/5
(31)
A _____ is an arrangement of physical facilities based on the sequence of operations that is performed during the manufacturing of a good or delivery of a service.
(Multiple Choice)
4.9/5
(40)
__________is the interval between successive outputs coming off the assembly line.
(Multiple Choice)
4.9/5
(38)
In the context of assembly-line balancing, _____ is the difference between total time available and the sum of the actual times for productive tasks.
(Multiple Choice)
4.8/5
(30)
A Gallup study showed that there is no significant difference found in the productivities among workers who are allowed to personalize their workplaces and those who are not.
(True/False)
4.8/5
(36)
Showing 1 - 20 of 31
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)