In the context of the Project Evaluation and Review Technique (PERT), which of the following is true of the beta probability distribution approach?

Free
(Multiple Choice)
4.9/5
(28)
Correct Answer:
Verified

A

Rose is in charge of advertising a new product launched by her company. She has defined the advertising for this product as an individual project that consists of seven activities. Following are the characteristics of these activities: Activity Immediate Predecessor(s) Activity Time(in weeks) None 2 None 2 4 5 5 2 , 2 Calculate the earliest completion time for the project using a Gantt chart.

Free
(Multiple Choice)
4.7/5
(45)
Correct Answer:
Verified

D

In the context of projects,__________are discrete tasks that consume resources and time.

Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
Verified

B

Project managers do not need technical expertise.

(True/False)
4.9/5
(31)

__________refers to reducing the total time to complete the project to meet a revised due date.

(Multiple Choice)
4.8/5
(39)

In the context of the Critical Path Method (CPM), the slack time (ST) for an activity is computed as:

(Multiple Choice)
4.8/5
(30)

The district magistrate of a city has decided to reconstruct the most frequented street of the city. He plans to block the street for the duration of the work, which will cause considerable inconvenience to the people of the city. The project has three parallel paths defined as the following: Path A-B-C-H will take 16 days. Path A-D-E-H will take 22 days. Path A-F-G-H will take 30 days. In the given scenario, which of the following statements is true?

(Multiple Choice)
4.8/5
(38)

In the project management life cycle, the__________involves collecting and assessing status reports, managing changes to baselines, and responding to circumstances that can negatively impact the project participants.

(Multiple Choice)
4.8/5
(38)

Implementing a new computer-aided design system is an example of a project in the functional area of _____.

(Multiple Choice)
4.9/5
(42)

Which of the following is true of the Critical Path Method (CPM)

(Multiple Choice)
4.8/5
(40)

Which of the following is an assumption made by the critical path method (CPM)

(Multiple Choice)
4.7/5
(32)

In the context of the Critical Path Method (CPM), latest start (LS) and latest finish (LF) times are computed by making a backward pass through the network, beginning with the ending project activity or activities.

(True/False)
4.8/5
(30)

The activities, their respective immediate predecessors, and activity times for a particular project are given in the table below. Determine the earliest completion time for this project using a Gantt chart. Activity Immediate Predecessor(s) Activity Time(in weeks) None 1 None 1 4 5 , 5 3 2

(Multiple Choice)
4.9/5
(35)

A pure project organizational structure eliminates the duplication of resources across the organization.

(True/False)
4.8/5
(28)

In the context of project management,__________a project involves releasing and reassigning people.

(Multiple Choice)
4.8/5
(40)

The only way the project completion time can be reduced is by crashing activities on the critical path.

(True/False)
4.8/5
(38)

Following is the Project Evaluation and Review Technique (PERT) network used to execute a marketing campaign at TeaTime Inc. Calculate the variance for the project.

(Multiple Choice)
4.9/5
(37)

Which of the following is true of crashing a project

(Multiple Choice)
4.9/5
(29)

Which of the following is true of a typical functional organization

(Multiple Choice)
4.9/5
(32)

Which of the following is an example of a project that belongs to the functional area of accounting and finance

(Multiple Choice)
4.8/5
(39)