Exam 19: Statistical Applications in Quality Management
Exam 1: Defining and Collecting Data200 Questions
Exam 2: Organizing and Visualizing189 Questions
Exam 3: Numerical Descriptive Measures80 Questions
Exam 4: Basic Probability108 Questions
Exam 5: Discrete Probability Distributions81 Questions
Exam 6: Conthe Tinuonormausl Disdis Tributionstribution and Other38 Questions
Exam 7: Sampling Distributions62 Questions
Exam 8: Confidence Interval Estimation139 Questions
Exam 9: Fundamentals of Hypothesis Testing: One-Sample Tests133 Questions
Exam 10: Two-Sample Tests95 Questions
Exam 11: Analysis of Variance73 Questions
Exam 12: Chi-Square and Nonparametric100 Questions
Exam 13: Simple Linear Regression89 Questions
Exam 14: Introduction to Multiple113 Questions
Exam 15: Multiple Regression62 Questions
Exam 16: Time-Series Forecasting61 Questions
Exam 17: Business Analytics102 Questions
Exam 18: A Roadmap for Analyzing Data133 Questions
Exam 19: Statistical Applications in Quality Management86 Questions
Exam 20: Decision Making121 Questions
Select questions type
The cause of variation that can be reduced only by changing the system is ______ cause
variation.
(Essay)
4.8/5
(35)
True or False: The SS method involves methods that enable participants to reduce setup time
for equipment and resources and materials needed for changeover.
(True/False)
4.9/5
(35)
SCENARIO 19-4
She also decides that lower and upper specification limit for the critical-to-quality variable should be
10 and 30 seconds, respectively.
-Referring to Scenario 19-4, suppose the supervisor constructs an R chart to see if the variability in
Collection times is in-control.What is the center line of this R chart?

(Multiple Choice)
4.8/5
(35)
True or False: SMED focuses on preventing the causes of defects.
(True/False)
4.7/5
(34)
SCENARIO 19-3
-Referring to Scenario 19-3, suppose the sample mean and range data were based on 11
Observations per day instead of 10.How would this change affect the lower and upper control
Limits of the R chart?

(Multiple Choice)
4.9/5
(23)
SCENARIO 19-4
She also decides that lower and upper specification limit for the critical-to-quality variable should be
10 and 30 seconds, respectively.
-Referring to Scenario 19-4, suppose the supervisor constructs an
chart to see if the process is
In-control.What is the center line of the chart?


(Multiple Choice)
4.8/5
(30)
True or False: Changes in the system to reduce common cause variation are the responsibility of
management.
(True/False)
4.8/5
(42)
SCENARIO 19-1
-Referring to Scenario 19-1, which expression best characterizes the p chart?

(Multiple Choice)
4.7/5
(45)
True or False: Poke-Yoke devices establish ways to eliminate unnecessary housekeeping
aspects of a work environment.
(True/False)
4.9/5
(31)
SCENARIO 19-4
She also decides that lower and upper specification limit for the critical-to-quality variable should be
10 and 30 seconds, respectively.
-Referring to Scenario 19-4, suppose the supervisor constructs an
chart to see if the process is
In-control.Which expression best describes this chart?


(Multiple Choice)
5.0/5
(41)
True or False: SMED establishes ways to clean and maintain the necessary housekeeping
aspects of a work environment.
(True/False)
4.8/5
(27)
True or False: Quick Changeover Techniques involve methods that enable participants to
reduce setup time for equipment and resources and materials needed for changeover.
(True/False)
4.9/5
(36)
True or False: Common causes of variation are correctable without modifying the system.
(True/False)
4.8/5
(35)
True or False: Quick Changeover Techniques is among the tools of Lean Six Sigma.
(True/False)
4.8/5
(31)
SCENARIO 19-4
She also decides that lower and upper specification limit for the critical-to-quality variable should be
10 and 30 seconds, respectively.
-Referring to Scenario 19-4, suppose the supervisor constructs an
chart to see if the process is
In-control.What are the lower and upper control limits of this chart?


(Multiple Choice)
4.8/5
(27)
SCENARIO 19-2
-Referring to Scenario 19-2, which expression best characterizes the p chart?

(Multiple Choice)
4.7/5
(36)
True or False: The Cp index measures the potential of a process, not its actual performance.
(True/False)
4.9/5
(37)
Which of the following situations suggests a process that appears to be operating out of statistical
Control?
(Multiple Choice)
4.9/5
(38)
Maintaining the gains that have been made with a revised process in the long term by avoiding
Potential problems that can occur when a process is changed involves which part of the DMAIC
Process?
(Multiple Choice)
4.8/5
(33)
True or False: TPM establishes ways to clean and maintain the necessary housekeeping aspects
of a work environment.
(True/False)
4.7/5
(39)
Showing 61 - 80 of 86
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)