Exam 19: Transportation Models
Exam 1: Operations and Productivity138 Questions
Exam 2: Operations Strategy in a Global Environment134 Questions
Exam 3: Project Management131 Questions
Exam 4: Forecasting148 Questions
Exam 5: Design of Goods and Services126 Questions
Exam 6: Managing Quality226 Questions
Exam 7: Process Strategies259 Questions
Exam 8: Location Strategies233 Questions
Exam 9: Human Resources, Job Design, and Work Measurement321 Questions
Exam 10: Supply Chain Management158 Questions
Exam 11: Inventory Management230 Questions
Exam 12: Aggregate Planning and Sop122 Questions
Exam 13: Material Requirements Planning Mrp and Erp133 Questions
Exam 14: Short-Term Scheduling124 Questions
Exam 15: Lean Operations122 Questions
Exam 16: Maintenance and Reliability119 Questions
Exam 17: Decision-Making Tools101 Questions
Exam 18: Linear Programming102 Questions
Exam 19: Transportation Models92 Questions
Exam 20: Waiting-Line Models126 Questions
Exam 21: Learning Curves114 Questions
Exam 22: Simulation78 Questions
Exam 23: Applying Analytics to Big Data in Operations Management61 Questions
Select questions type
Which of the following is NOT information needed for a transportation problem?
(Multiple Choice)
4.8/5
(28)
A firm has established a distribution network for the supply of a raw material critical to its manufacturing. Currently there are two origins for this raw material, which must be shipped to three manufacturing plants. The current network has the following characteristics:
The firm has identified two potential sites for a third raw material source; these are identified as Candidate A and Candidate B. From A, the costs to ship would be $9 to Plant 1, $10 to Plant 2, and $12 to Plant 3, respectively. From B, these costs would be $11, $14, and $8, respectively. The new source, wherever it is located, will have a capacity of 500 units. Set up this problem as two separate transportation matrices. (Do not solve the problem.)

(Essay)
4.8/5
(32)
When using the stepping-stone method, the closed path sometimes has the shape of a triangle as diagonal moves are permitted.
(True/False)
4.9/5
(30)
The Shamrock Transportation Company has four terminals: A, B, C, and D. At the start of a particular day, there are 8, 8, 6, and 3 tractors available at those terminals, respectively. During the previous night, trailers were loaded at plants R, S, T, and U. The number of trailers at each plant is 2, 12, 5, and 6, respectively. The company dispatcher has determined the distances between each terminal and each plant, as follows. How many tractors should be dispatched from each terminal to each plant in order to minimize the total number of miles traveled?


(Essay)
4.8/5
(26)
Source A has capacity of 15, Source B has capacity of 30, Destination 1 has demand of 5 and Destination 2 has demand of 20. Fill in the following table with the correct initial solution for a northwest-corner method approach.


(Essay)
4.7/5
(31)
To handle degeneracy, a very large quantity is placed in one of the unused squares.
(True/False)
4.8/5
(37)
Consider the transportation problem and its optimal solution in the tables below. The cell Source 3 - Destination 3 is currently empty. What would be the change in the total shipping cost if the largest possible amount were shipped using that route, leaving all the supply and demand conditions unchanged? 

(Multiple Choice)
4.9/5
(37)
Neither the northwest-corner rule nor the intuitive method considers shipping cost in making initial allocations.
(True/False)
4.9/5
(36)
For the problem below, what is the quantity assigned to the cell Source 3-Destination 1 using the intuitive method for an initial feasible solution? 

(Multiple Choice)
4.9/5
(39)
A transportation problem with 8 sources and 6 destinations will have an optimal solution that uses at most 13 of the 48 possible routes.
(True/False)
4.9/5
(46)
Find the minimum cost solution for the transportation problem detailed in the table below.
Before your solution can be implemented, you discover that the combination Source 2 - Destination 2 is unavailable, due to political turmoil in the country where Source 2 is located. Solve the revised problem. How much is cost increased by this complication?

(Essay)
4.8/5
(33)
A firm has established a distribution network for the supply of a raw material critical to its manufacturing. Currently there are two origins for this raw material, which must be shipped to three manufacturing plants. The current network has the following characteristics:
The firm has identified five potential sites for a third raw material source:
The new source, wherever it is located, will have a capacity of 500 units. Solve with the transportation method. Which site should be selected?


(Multiple Choice)
4.9/5
(39)
Given the following feasible solution, determine if the problem is degenerate and then find the optimal solution and its cost. Assume that capacity for source A is 10 and 30 for source B. Destination A demands 10 units while destination B demands 30 units. Cost of shipping per unit is given as AA ($4), AB ($1), BA ($3), and BB ($2).


(Essay)
4.8/5
(30)
For the problem data set below, what is the northwest-corner allocation to the cell Source 1 - Destination 2? 

(Multiple Choice)
4.8/5
(30)
Suppose the solution for a transportation model fills 5 cells with quantities to be shipped. Which of the following combinations of sources and destinations would be degenerate?
(Multiple Choice)
4.7/5
(29)
For the transportation problem below, construct an initial feasible solution using the intuitive method.


(Essay)
4.8/5
(27)
For the data below, construct an initial feasible solution using the northwest-corner rule.


(Essay)
4.8/5
(36)
A transportation problem with a total supply of 500 and a total demand of 400 will have an optimal solution that leaves 100 units of demand unmet.
(True/False)
4.9/5
(29)
Showing 61 - 80 of 92
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)