Exam 14: Short-Term Scheduling
Exam 1: Operations and Productivity138 Questions
Exam 2: Operations Strategy in a Global Environment134 Questions
Exam 3: Project Management131 Questions
Exam 4: Forecasting148 Questions
Exam 5: Design of Goods and Services126 Questions
Exam 6: Managing Quality226 Questions
Exam 7: Process Strategies259 Questions
Exam 8: Location Strategies233 Questions
Exam 9: Human Resources, Job Design, and Work Measurement321 Questions
Exam 10: Supply Chain Management158 Questions
Exam 11: Inventory Management230 Questions
Exam 12: Aggregate Planning and Sop122 Questions
Exam 13: Material Requirements Planning Mrp and Erp133 Questions
Exam 14: Short-Term Scheduling124 Questions
Exam 15: Lean Operations122 Questions
Exam 16: Maintenance and Reliability119 Questions
Exam 17: Decision-Making Tools101 Questions
Exam 18: Linear Programming102 Questions
Exam 19: Transportation Models92 Questions
Exam 20: Waiting-Line Models126 Questions
Exam 21: Learning Curves114 Questions
Exam 22: Simulation78 Questions
Exam 23: Applying Analytics to Big Data in Operations Management61 Questions
Select questions type
________ determines the order in which jobs should be done at each work center.
Free
(Short Answer)
4.9/5
(26)
Correct Answer:
Sequencing
The benefits of effective scheduling include lower cost, faster throughput, and dependable delivery.
(True/False)
4.7/5
(40)
Which of the following is a limitation of rules-based dispatching systems?
(Multiple Choice)
4.9/5
(42)
Which of the following is an aid used to monitor jobs in progress?
(Multiple Choice)
4.8/5
(33)
The correct sequence from longest to smallest duration scheduling is:
(Multiple Choice)
5.0/5
(31)
The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the throughput time (makespan) to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows:
(a) Use Johnson's rule to sequence these five jobs for minimum total duration. Show your work in determining the job sequence.
(b) The optimal sequence is ________.
(c) Chart the progress of the five jobs in this optimal sequence.
(d) After how many hours will all jobs be completed?

(Essay)
4.9/5
(33)
If job 5 takes 3, 4, or 6 hours to be completed by workers A, B, and C, respectively, what would the row values for job 5 be after performing Step 1A of the assignment method?
(Multiple Choice)
4.9/5
(33)
A work center had planned outputs of 10, 15, 13, and 20 hours with actual outputs of 12, 14, 15, and 18 hours. What is the cumulative deviation in output?
(Multiple Choice)
4.8/5
(35)
Lockport Marine Services, Inc. wishes to assign a set of jobs to a set of machines. The following table provides data on the cost of production of each job when performed on a specific machine.
(a) Determine the set of assignments that minimizes production cost.
(b) What is the total production cost of your assignments?


(Essay)
4.7/5
(36)
What does the use of the shortest processing time sequencing rule generally produce?
(Multiple Choice)
4.8/5
(39)
In what five ways does the problem of scheduling service systems differ from that of scheduling manufacturing systems?
(Essay)
4.9/5
(36)
Dispatching rules are typically judged by four effectiveness criteria: average completion time, utilization, average number of jobs in the system, and average customer satisfaction.
(True/False)
4.8/5
(30)
A firm that specializes in desktop publishing for local charities has agreed to take on the following jobs. The firm has not decided which dispatching rule to apply in order to prioritize the jobs and fix them into the schedule. All dates are specified as days from today.
(a) Complete the following table. Show your supporting calculations below.
(b) Which dispatching rule has the best score for flow time?
(c) Which dispatching rule has the best score for work-in-process (jobs in the system)?
(d) Which dispatching rule has the best score for lateness?



(Essay)
4.7/5
(31)
The time between the release of a job to a work center until the job is finished is ________.
(Short Answer)
4.9/5
(41)
Five jobs are waiting to be processed. Their processing times and due dates are given below. Using the shortest processing time dispatching rule, in which order should the jobs be processed? 

(Multiple Choice)
4.7/5
(30)
Forward scheduling is used in manufacturing environments, as well as service environments such as catering a banquet or scheduling surgery.
(True/False)
4.8/5
(23)
Showing 1 - 20 of 124
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)