Exam 6: Process Design and Facility Layout
Exam 1: Introduction to Operations Management47 Questions
Exam 2: Competitiveness, Strategic Planning, and Productivity44 Questions
Exam 3: Demand Forecasting62 Questions
Exam 4: Product Design54 Questions
Exam 5: Strategic Capacity Planning53 Questions
Exam 6: Process Design and Facility Layout59 Questions
Exam 7: Workjob Design53 Questions
Exam 8: Location Planning and Analysis45 Questions
Exam 9: Management of Quality48 Questions
Exam 10: Statistical Quality Control48 Questions
Exam 11: Supply Chain Management55 Questions
Exam 12: Inventory Management40 Questions
Exam 13: Aggregate Operations Planning and Master Scheduling46 Questions
Exam 14: Material Requirements Planning and Enterprise Resource Planning53 Questions
Exam 15: Just-In-Time and Lean Production38 Questions
Exam 16: Job and Staff Scheduling42 Questions
Exam 17: Project Management61 Questions
Exam 18: Waiting-Line Analysis38 Questions
Exam 19: Answers to Selected Problems52 Questions
Exam 20: Tables7 Questions
Exam 21: Working With the Normal Distribution49 Questions
Select questions type
Which of the following is NOT a supply side element of the Britvic National Distribution Centre?
Free
(Multiple Choice)
4.7/5
(40)
Correct Answer:
B
Downstream vertical integration refers to the strategy of expanding on the demand side of the
network.
Free
(True/False)
4.9/5
(39)
Correct Answer:
True
Capacity management, location and vertical integration decisions all rely on assumptions
regarding future demand.
Free
(True/False)
4.8/5
(34)
Correct Answer:
True
There is always sufficient capacity to meet demand, therefore revenue is maximised and customers are satisfied.
(Multiple Choice)
4.9/5
(33)
Supply-side influences on the design of operations would NOT include:
(Multiple Choice)
4.8/5
(44)
The location decision is determined by the relative strength of supply-side and demand-side factors. Are Labour skills supply-side or demand-side.
(Multiple Choice)
4.9/5
(28)
If the company does not have specialised knowledge in the production of the product.
(Multiple Choice)
4.8/5
(34)
Over-capacity problems are minimised if forecasts are optimistic.
(Multiple Choice)
4.9/5
(27)
The weighted-score method to find a location is based on calculating the weight of goods to be
transported to give an indication of relative costs.
(True/False)
4.9/5
(28)
The location decision is determined by the relative strength of supply-side and demand-side factors. Are Convenience for customers supply-side or demand-side.
(Multiple Choice)
4.9/5
(39)
A supply network perspective means setting an operation in the context of all other operations
with which it interacts.
(True/False)
4.9/5
(30)
If the activity is considered to be of strategic importance.
(Multiple Choice)
4.9/5
(33)
The suppliers and customers who have direct contact with an operation are called its:
(Multiple Choice)
4.8/5
(37)
If a car assembly operation were to buy a component maker this is a form of:
(Multiple Choice)
4.7/5
(32)
Sales of computers over the last five months were January 34 / February 37 / March 28 / April 37 / May 39. What is the difference between the three-month moving average forecast for May and
The actual sales?
(Multiple Choice)
4.7/5
(30)
According to Lord Sieff of Marks and Spencer what are the three most important things in retailing?
(Multiple Choice)
4.9/5
(32)
If a wholesaler were to buy an assembly operation this is a form of:
(Multiple Choice)
4.7/5
(37)
Showing 1 - 20 of 59
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)