Exam 6: Process Design and Facility Layout

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is NOT a supply side element of the Britvic National Distribution Centre?

Free
(Multiple Choice)
4.7/5
(40)
Correct Answer:
Verified

B

Downstream vertical integration refers to the strategy of expanding on the demand side of the network.

Free
(True/False)
4.9/5
(39)
Correct Answer:
Verified

True

Capacity management, location and vertical integration decisions all rely on assumptions regarding future demand.

Free
(True/False)
4.8/5
(34)
Correct Answer:
Verified

True

There is always sufficient capacity to meet demand, therefore revenue is maximised and customers are satisfied.

(Multiple Choice)
4.9/5
(33)

Supply-side influences on the design of operations would NOT include:

(Multiple Choice)
4.8/5
(44)

Second-tier suppliers in Company A network are:

(Multiple Choice)
4.8/5
(33)

The location decision is determined by the relative strength of supply-side and demand-side factors. Are Labour skills supply-side or demand-side.

(Multiple Choice)
4.9/5
(28)

If the company does not have specialised knowledge in the production of the product.

(Multiple Choice)
4.8/5
(34)

If a retailer were to buy a wholesaler this is a form of:

(Multiple Choice)
4.8/5
(33)

Over-capacity problems are minimised if forecasts are optimistic.

(Multiple Choice)
4.9/5
(27)

The weighted-score method to find a location is based on calculating the weight of goods to be transported to give an indication of relative costs.

(True/False)
4.9/5
(28)

The location decision is determined by the relative strength of supply-side and demand-side factors. Are Convenience for customers supply-side or demand-side.

(Multiple Choice)
4.9/5
(39)

A supply network perspective means setting an operation in the context of all other operations with which it interacts.

(True/False)
4.9/5
(30)

If the activity is considered to be of strategic importance.

(Multiple Choice)
4.9/5
(33)

The suppliers and customers who have direct contact with an operation are called its:

(Multiple Choice)
4.8/5
(37)

An advantage of a capacity-lagging strategy is that:

(Multiple Choice)
4.9/5
(33)

If a car assembly operation were to buy a component maker this is a form of:

(Multiple Choice)
4.7/5
(32)

Sales of computers over the last five months were January 34 / February 37 / March 28 / April 37 / May 39. What is the difference between the three-month moving average forecast for May and The actual sales?

(Multiple Choice)
4.7/5
(30)

According to Lord Sieff of Marks and Spencer what are the three most important things in retailing?

(Multiple Choice)
4.9/5
(32)

If a wholesaler were to buy an assembly operation this is a form of:

(Multiple Choice)
4.7/5
(37)
Showing 1 - 20 of 59
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)