Exam 4: Product Design
Exam 1: Introduction to Operations Management47 Questions
Exam 2: Competitiveness, Strategic Planning, and Productivity44 Questions
Exam 3: Demand Forecasting62 Questions
Exam 4: Product Design54 Questions
Exam 5: Strategic Capacity Planning53 Questions
Exam 6: Process Design and Facility Layout59 Questions
Exam 7: Workjob Design53 Questions
Exam 8: Location Planning and Analysis45 Questions
Exam 9: Management of Quality48 Questions
Exam 10: Statistical Quality Control48 Questions
Exam 11: Supply Chain Management55 Questions
Exam 12: Inventory Management40 Questions
Exam 13: Aggregate Operations Planning and Master Scheduling46 Questions
Exam 14: Material Requirements Planning and Enterprise Resource Planning53 Questions
Exam 15: Just-In-Time and Lean Production38 Questions
Exam 16: Job and Staff Scheduling42 Questions
Exam 17: Project Management61 Questions
Exam 18: Waiting-Line Analysis38 Questions
Exam 19: Answers to Selected Problems52 Questions
Exam 20: Tables7 Questions
Exam 21: Working With the Normal Distribution49 Questions
Select questions type
Which of the following is not a characteristic of a line process?
Free
(Multiple Choice)
5.0/5
(39)
Correct Answer:
D
Which factor of good product/service design best matches the following performance objective: Can allow for variations.
Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
B
Which one of the following statements should be considered as part of a broad definition of design activity?
Free
(Multiple Choice)
4.9/5
(40)
Correct Answer:
E
What is another term used to describe being pessimistic and considering the consequences of everything going wrong?
(Multiple Choice)
4.9/5
(43)
What are the three broad categories of evaluation for assessing design options?
(Multiple Choice)
4.7/5
(40)
The volume-variety position of an operation has implications for almost every aspect of its design activities. In a low volume, high variety operation, which is the correct combination of design
Decisions?
(Multiple Choice)
4.9/5
(33)
Which of the following is not a characteristics of Design activity?
(Multiple Choice)
4.8/5
(34)
In process mapping derived from 'scientific management', what does the following symbol represent?
(Multiple Choice)
4.8/5
(32)
What name is given for the technique used to calculate the total energy used for a product, including all production inputs, transportation, maintenance, and final disposal?
(Multiple Choice)
4.8/5
(41)
Is the following design activity more suited to low volume/high variety or high volume/low variety: Dedicated process technology.
(Multiple Choice)
4.8/5
(40)
Is the following design activity more suited to low volume/high variety or high volume/low variety: Low level of product/service standardisation.
(Multiple Choice)
4.8/5
(27)
In the design activity, which of the following is likely to be a transformed input resource?
(Multiple Choice)
4.8/5
(40)
Characteristics of line or continuous process types usually include:
(Multiple Choice)
4.9/5
(35)
Which factor of good product/service design best matches the following performance objective: Can require standardised services.
(Multiple Choice)
4.8/5
(32)
The design of a product and the design of the process that will produce it should be considered
separately.
(True/False)
4.8/5
(27)
Understanding the full consequences of adopting the design option relates to what evaluation criteria?
(Multiple Choice)
4.7/5
(44)
Is the following design activity more suited to low volume/high variety or high volume/low variety: Process design emphasis in the operation.
(Multiple Choice)
5.0/5
(35)
Showing 1 - 20 of 54
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)