Exam 13: Working With Projects

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A(n) __________ determines the timeline, sequence, and interrelatedness of activities.

(Short Answer)
4.9/5
(48)

Using the information shown in the previous table, what is the standard deviation for the entire project?

(Multiple Choice)
4.9/5
(40)

An important aspect of project closure is that lessons learned are discussed and recorded for future use.

(True/False)
4.8/5
(46)

Scope creep in a project is when the project slows to a crawl because of a lack of project details.

(True/False)
4.9/5
(42)

Using the information shown in the following table, the expected time for activity B is Using the information shown in the following table, the expected time for activity B is

(Multiple Choice)
4.8/5
(46)

Projects fail because of deficient __________ or __________.

(Short Answer)
4.8/5
(31)

__________ and __________ are two methods of evaluating short- to medium-term projects with predictable cash flows.

(Short Answer)
4.9/5
(34)

If activity E is reduced by 1 week and activity A is reduced by 2 weeks, what is the new total project cost?

(Multiple Choice)
4.8/5
(40)

Janet was tasked with assessing competing projects with unpredictable cash flows and where the probabilities could not be estimated. In order for her to perform her analysis, she should use the __________ or __________ techniques.

(Short Answer)
5.0/5
(41)

A Gantt chart is a colorful chart showing complex task interdependencies, costs, and activities on a time line.

(True/False)
4.9/5
(37)

Using the information shown in the following table, what is the slack time for activity E? Activity Duration (weeks) EST EFT LST LFT SLACK A 2 0 0 2 0 B 1 2 3 3 4 1 C 3 2 5 2 5 0 D 3 10 4 11 1 E 3 5 8 11 F 6 5 5 11 0 G 4 11 15 11 15 0

(Multiple Choice)
4.8/5
(33)

The scope of any project, indicating what will and will not be included as part of the project, is perhaps the most important part of the initiation phase.

(True/False)
5.0/5
(34)

Process failures arise when task times are underestimated or utilization of resources is overestimated.

(True/False)
4.8/5
(43)

A project can be recognized by

(Multiple Choice)
4.9/5
(38)

Portfolio selection and management skills are becoming valuable in overseeing and orchestrating a global portfolio of projects.

(True/False)
4.8/5
(26)

An activity with most slack time is called a critical activity.

(True/False)
4.8/5
(38)

Using the second diagram above or using the information shown in the previous table, what is the project duration?

(Multiple Choice)
4.8/5
(32)

The __________ phase is when project details are thrashed out and documented.

(Short Answer)
4.8/5
(40)

Project managers manage three things: performance, people, and change.

(True/False)
4.8/5
(37)

Project performance can be assessed by measuring all of the following dimensions except

(Multiple Choice)
4.8/5
(36)
Showing 41 - 60 of 92
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)