Compared to program development,systems development is ________.

(Multiple Choice)
4.9/5
(32)

How is software designed?

(Essay)
4.8/5
(35)

The goals and scope of a new information system are determined during the requirements analysis phase of the systems development life cycle.

(True/False)
4.9/5
(32)

During the requirements analysis phase of the SDLC,the development team will create a(n)________ in case the new system involves a new database or substantial changes to an existing database.

(Multiple Choice)
4.7/5
(37)

________ is the process of allowing future system users to try out the new system on their own.

(Multiple Choice)
4.7/5
(29)

Projects that spend little time documenting requirements are sometimes said to be in analysis paralysis.

(True/False)
4.8/5
(28)

What are the tasks of system maintenance?

(Essay)
4.7/5
(24)

Which of the following statements is true with regard to system maintenance?

(Multiple Choice)
4.9/5
(42)

Test plans usually include not only the normal actions that users will take,but also incorrect actions.

(True/False)
5.0/5
(35)

In terms of software design,for ________,the team must determine candidate products and evaluate them against the requirements while for ________,the team produces design documentation for writing program code.

(Multiple Choice)
4.9/5
(35)

What are the main tasks that are performed during the system definition phase of the SDLC?

(Essay)
4.8/5
(41)

What are the phases of the systems development life cycle (SDLC)?

(Essay)
4.9/5
(38)

Which step in the SDLC process aims to eliminate obviously nonsensible projects?

(Multiple Choice)
4.8/5
(33)

Parallel installation is the ________ style of installation.

(Multiple Choice)
4.9/5
(39)

One of the major challenges in systems development is changing technology.

(True/False)
4.9/5
(42)

The cost feasibility of a systems development project is usually expressed in exact figures or terms.

(True/False)
4.8/5
(39)

Beyond a workgroup of four or five people,diseconomies of scale begin to take over.

(True/False)
4.8/5
(35)

What are the four ways in which organizations can implement a system conversion?

(Essay)
4.8/5
(32)

As development teams become larger,the average contribution per worker ________.

(Multiple Choice)
4.9/5
(36)

The easiest and cheapest time to alter the information system is in the requirements analysis phase of the systems development life cycle.

(True/False)
4.8/5
(29)