Large-scale systems development projects require the balancing of three critical drivers: requirements,cost,and time.

Free
(True/False)
4.9/5
(29)
Correct Answer:
Verified

True

The trade-off between time and cost is a simple process; the time involved in a project can always be reduced by increasing cost.

Free
(True/False)
4.9/5
(36)
Correct Answer:
Verified

False

The term "configuration control" refers to a set of management policies,practices,and tools that developers use to maintain control over the project's resources.

Free
(True/False)
4.8/5
(31)
Correct Answer:
Verified

True

Larger projects with longer development intervals will find it easier to keep to the baseline or plan.

(True/False)
4.7/5
(35)

What are the biggest challenges for managing a large-scale systems development project?

(Essay)
4.8/5
(35)

Documents,designs,prototypes,data models,database designs,working data entry screens,and the like are examples of deliverables in a systems development project.

(True/False)
4.9/5
(28)

Requirements creep is the process by which a project manager reduces his/her responsibilities for requirements through miniscule rollbacks.

(True/False)
4.7/5
(37)

Systems development projects require the balancing of three critical drivers: requirements,cost,and ________.

(Multiple Choice)
4.9/5
(31)

The purpose of risk management is to ensure that managers understand project risks and balance risk factors.

(True/False)
4.8/5
(30)

A well-managed project will never face problems of diseconomies of scale.

(True/False)
4.9/5
(32)

________ is the process by which users agree to one set of conditions,then add a bit more,then add a bit more,and so forth.

(Multiple Choice)
4.8/5
(38)

A plan,known as the ________,of a project stipulates the tasks to be accomplished,the labor and other resources assigned to those tasks,and the schedule for completion.

(Multiple Choice)
4.9/5
(38)

________ is a knowledge area that concerns contracts with outside vendors for services,materials,and outsourcing of functions.

(Multiple Choice)
4.9/5
(41)

Regarding task dependencies,all tasks must begin and end at the same time.

(True/False)
4.8/5
(39)

The development of large-scale systems can involve integrating products and services from different companies.

(True/False)
4.7/5
(31)

A ________ is a hierarchy of the tasks required to complete a project.

(Multiple Choice)
4.9/5
(24)

What is the PMBOK Guide for project management? List the components of the grid in PMBOK Guide 2004.

(Essay)
4.9/5
(36)

Users must take responsibility for managing requirements changes and for avoiding requirements creep.

(True/False)
4.7/5
(37)

What is a critical path? How is a critical path analysis done?

(Essay)
4.9/5
(32)

The critical path is a hierarchy of the tasks required to complete a project.

(True/False)
4.9/5
(37)