Exam 27: Systems Development Project Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A loss of control over a project's configuration is easily fixed through remedial measures.

(True/False)
4.9/5
(36)

Which of the following is a technique that stipulates phases and processes for constructing information systems,but does not address the management of large-scale projects?

(Multiple Choice)
4.9/5
(40)

The biggest challenge in planning systems development is scheduling.

(True/False)
4.8/5
(42)

The biggest challenge in planning systems development is ________.

(Multiple Choice)
4.8/5
(33)

Avoiding the major schedule risks and never developing software in-house is one of the approaches businesses take to address the challenges of scheduling for large-scale systems.

(True/False)
4.8/5
(35)

________ is the knowledge area that refers to the management of the overall project and the construction of the final product.

(Multiple Choice)
4.9/5
(44)

The baseline WBS can be used for monitoring the project.

(True/False)
4.9/5
(41)

With respect to WBS,________ means to define the system boundaries.

(Multiple Choice)
4.9/5
(26)

The PMBOK Guide does not describe the details of each practice or technique but instead,identifies those practices that are known to be effective for different situations and briefly describes their use.

(True/False)
4.8/5
(44)

The term ________ refers to a set of management policies,practices,and tools that developers use to maintain control over the project's resources.

(Multiple Choice)
4.7/5
(43)

The biggest challenge in planning large-scale systems development is scheduling.Describe the three approaches organizations take to address this challenge.

(Essay)
4.8/5
(26)

In the PMBOK Guide,________ refer to different stages in the life of a project.

(Multiple Choice)
4.8/5
(33)

What are the characteristics of large-scale systems development projects?

(Essay)
4.7/5
(36)

________ is a knowledge area that concerns the methods,media,and schedules for exchanging information with the project's sponsors,within the team itself,and with others having an interest in the progress of the project.

(Multiple Choice)
4.8/5
(35)

Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.

(True/False)
4.9/5
(36)

Function points can be used to determine the number of lines of code,which can then be used to estimate project schedules.

(True/False)
4.7/5
(36)

Each task in a systems development project should culminate in one or more ________.

(Multiple Choice)
4.9/5
(37)

The ________ is the sequence of activities that determine the earliest date by which the project can be completed.

(Multiple Choice)
4.9/5
(36)