Exam 15: Constraint Management: Simplifying Complex Systems

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

Which of the following statements is true about lean systems and constraint management?

(Multiple Choice)
4.8/5
(50)

Disruptions to systems can generally be measured by their duration.

(True/False)
4.9/5
(38)

The phenomenon of increasing impact from statistical fluctuation in production systems is recognized as

(Multiple Choice)
4.9/5
(42)

Match these items. -Activation

(Multiple Choice)
4.7/5
(28)

Identifying ways to use a constrained resource better is a process called

(Multiple Choice)
4.7/5
(42)

Match these items. -Elevation

(Multiple Choice)
4.9/5
(30)

Match these items. -Time buffer

(Multiple Choice)
4.8/5
(34)

Currently the major bottlenecks at a manufacturing plant that makes electric fixtures are the paint line and the 300-ton press that stamp out sheet metal parts. Hundreds of different kinds of parts must pass through the processes, and many jobs get stalled in queues before one or both of these processes. What kind of solutions would you recommend the management use in order to solve the above problem if Constraint Management were employed?

(Essay)
4.7/5
(33)

Match these items. -Constraint Management

(Multiple Choice)
4.9/5
(26)

Match these items. -System's constraint

(Multiple Choice)
4.9/5
(34)
Showing 41 - 50 of 50
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)