Exam 14: Capacity: Matching Productive Resources to Demand
Exam 1: Introduction: Why Operations Management48 Questions
Exam 2: Profitability: Business Success From Operations Success62 Questions
Exam 3: Strategy and Value: Competing Through Operations59 Questions
Exam 4: Processes: Turning Resources Into Capabilities54 Questions
Exam 5: Cost: The Price of Value Creation56 Questions
Exam 6: Quality: Meeting Customer Expectations45 Questions
Exam 7: Quality Tools: From Process Performance to Process Perfection52 Questions
Exam 8: Timeliness: Scheduling and Project Management53 Questions
Exam 9: Supply Chain Management: Managing Business to Business Interactions38 Questions
Exam 10: Demand Forecasting: Building the Foundation for Resource Planning61 Questions
Exam 11: Inventory: Managing to Meet Demand56 Questions
Exam 12: Logistics: Positioning Goods in the Supply Chain55 Questions
Exam 13: Lean Systems: Eliminating Waste Through the Supply Chain57 Questions
Exam 14: Capacity: Matching Productive Resources to Demand56 Questions
Exam 15: Constraint Management: Simplifying Complex Systems50 Questions
Exam 16: Facilities: Making Location and Layout Decisions49 Questions
Exam 17: Workforce: Optimizing Human Capital Printed47 Questions
Select questions type
The time lost by the nonconstraint is lost for the entire system.
Free
(True/False)
4.8/5
(33)
Correct Answer:
False
Match these items.
-Best operating level
Free
(Multiple Choice)
5.0/5
(32)
Correct Answer:
A
Which of the following statements is true about constraint management?
Free
(Multiple Choice)
4.9/5
(41)
Correct Answer:
B
The critical resources that can limit the output level of the entire system are referred to as:
(Multiple Choice)
4.8/5
(37)
Rough-cut capacity planning is completed at the _____ level, while MRP is completed at the _____
level.
(Short Answer)
4.7/5
(40)
Costs associated with level production aggregate planning can include which of the following:
(Multiple Choice)
4.9/5
(40)
If a service temporarily met demand that was significantly above its design capacity, we would expect that
(Multiple Choice)
4.8/5
(44)
A mismatch between demand and design capacity can be even more serious in the service sector because its effects go beyond simple cost issues.
(True/False)
5.0/5
(39)
Capacity requirements planning, like MRP, is completed at the end item level.
(True/False)
4.8/5
(34)
The ______ ________ aggregate plan deals with demand fluctuations through a buffer of finished product inventory.
(Short Answer)
4.9/5
(48)
In level production aggregate planning the production level for each period is determined by:
(Multiple Choice)
4.9/5
(38)
The rate of production the business was designed to accommodate on a long-term basis is referred to as:
(Multiple Choice)
4.8/5
(33)
The capacity of one critical resource can _____ the output level of the entire system.
(Short Answer)
4.8/5
(46)
Showing 1 - 20 of 56