Among the benefits claimed for cellular manufacturing are less material handling and reduced setup time.

(True/False)
4.9/5
(49)

Which one of the following is not common to product layouts?

(Multiple Choice)
4.8/5
(39)

A common goal in designing process layouts is:

(Multiple Choice)
4.8/5
(36)

A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.50 per load meter moved. An analyst has prepared the following flow and distance matrices: A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.50 per load meter moved. An analyst has prepared the following flow and distance matrices:   What is the distance (in meters) from area III to area I of this new facility? What is the distance (in meters) from area III to area I of this new facility?

(Multiple Choice)
4.9/5
(44)

A group of machines including supervisory computer control, automatic material handling, and possibly robots is called:

(Multiple Choice)
4.7/5
(32)

Group technology is closely connected to cellular manufacturing.

(True/False)
4.8/5
(35)

A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.50 per load per meter moved. An analyst has prepared the following distances and flow matrices: A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.50 per load per meter moved. An analyst has prepared the following distances and flow matrices:   If departments X, Y, and Z were to be located in areas I, II, and III, respectively, what would be the total distance (in meters) loads would be moved each week? If departments X, Y, and Z were to be located in areas I, II, and III, respectively, what would be the total distance (in meters) loads would be moved each week?

(Multiple Choice)
4.7/5
(38)

The estimation of costs is generally most difficult when the ___________ process has been chosen.

(Multiple Choice)
4.8/5
(32)

Right-sized equipment tends to be larger than equipment used in traditional process layouts.

(True/False)
4.7/5
(33)

What is it about job shops that make them appropriate for products in the introductory phase of their life cycle?

(Multiple Choice)
4.9/5
(38)

For a production line, daily capacity can be determined by dividing the daily operating time by the line's cycle time.

(True/False)
4.7/5
(36)

A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet projected demand of 480 units per day. The tasks necessary to produce this product are: A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet projected demand of 480 units per day. The tasks necessary to produce this product are:   If the company wants the output rate to be equal to demand, what is the last task performed at the second workstation if tasks are assigned in order of the most following tasks? If the company wants the output rate to be equal to demand, what is the last task performed at the second workstation if tasks are assigned in order of the most following tasks?

(Multiple Choice)
4.9/5
(32)

The process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements is called:

(Multiple Choice)
4.8/5
(38)

A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.50 per load per meter moved. An analyst has prepared the following distances and flow matrices: A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.50 per load per meter moved. An analyst has prepared the following distances and flow matrices:   What are total weekly costs for the least costly process layout? What are total weekly costs for the least costly process layout?

(Multiple Choice)
4.9/5
(38)

A service organization such as a hospital is likely to use a(n) ________ layout because of variability in customer processing requirements.

(Multiple Choice)
5.0/5
(40)

Which term is most closely associated with cellular manufacturing?

(Multiple Choice)
4.9/5
(40)

Heuristic rules for line balancing will guarantee an optimal solution.

(True/False)
4.9/5
(33)

Which closeness rating reflects the undesirability of having two departments located near each other?

(Multiple Choice)
5.0/5
(45)

A manufacturing cell allows the production of a wide range of very different products.

(True/False)
4.9/5
(42)

The minimum number of workstations for a production line is determined in part by the desired output rate.

(True/False)
4.7/5