Exam 20: Maintenance– Static

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Attempting to determine when preventive maintenance activities should be performed is called:

(Multiple Choice)
4.9/5
(37)

A reactive approach to maintenance is _____________ maintenance.

(Multiple Choice)
4.7/5
(37)

Potential costs of equipment breakdown do not include:

(Multiple Choice)
4.9/5
(22)

Preventive maintenance is generally scheduled on the basis of:

(Multiple Choice)
4.8/5
(40)

In the area of maintenance, the Pareto phenomenon is reflected in the fact that:

(Multiple Choice)
4.9/5
(32)

Ideally, preventive maintenance will be performed:

(Multiple Choice)
4.8/5
(32)

The major approaches used in plans to deal with breakdowns include all of the following except:

(Multiple Choice)
4.9/5
(42)

The type of maintenance which is periodic in nature is:

(Multiple Choice)
4.9/5
(36)

In the broadest sense, preventive maintenance extends back to the installation stage of equipment and facilities.

(True/False)
4.8/5
(36)

Ideally, preventive maintenance will be performed before a breakdown or failure.

(True/False)
5.0/5
(50)

The average time before breakdown of a machine is normally distributed and has a mean of nine weeks and a standard deviation of 1.5 weeks. If breakdown cost averages $1,500 and preventive maintenance costs $500, what is the optimal preventive maintenance interval?

(Multiple Choice)
4.8/5
(39)

The goal of maintenance is to minimize cost.

(True/False)
4.8/5
(39)

The average time before breakdown of a machine is normally distributed and has a mean of 18 weeks and a standard deviation of three weeks. If breakdown cost averages $2,000 and preventive maintenance costs $1,400, what is the optimal preventive maintenance interval?

(Multiple Choice)
4.9/5
(47)

Breakdown maintenance is _____________; preventive maintenance is _________.

(Multiple Choice)
4.8/5
(38)

Breakdown maintenance is best performed on a regularly scheduled basis.

(True/False)
4.8/5
(43)

Suppose that for a particular piece of machinery, the frequency distribution of monthly breakdowns is as follows: Number of Breakdowns Prob. 0 0.50 1 0.25 2 0.10 3 0.10 4 0.05 The cost of a breakdown is $2,000, and the cost of a preventive maintenance program is $2,000 per month. If the preventive maintenance program is adopted, the probability of a machine breakdown is negligible. How much better off per month would the firm be if it adopted preventive maintenance?

(Multiple Choice)
4.9/5
(44)
Showing 21 - 36 of 36
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)