Exam 28: Systems Development Project Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The development of large-scale systems can involve the integration of products and services from different companies.

Free
(True/False)
4.8/5
(39)
Correct Answer:
Verified

True

Which of the following is a technique that stipulates phases and processes for constructing information systems (IS)but does not address the management of large-scale projects?

Free
(Multiple Choice)
4.8/5
(31)
Correct Answer:
Verified

A

________ is a knowledge area that concerns the methods,media,and schedules for exchanging information with the project's sponsors within a team and with others who have an interest in the progress of the project.

Free
(Multiple Choice)
4.8/5
(29)
Correct Answer:
Verified

B

Baseline work breakdown structures can be used for monitoring a project.

(True/False)
4.8/5
(35)

In the Project Management Body of Knowledge (PMBOK®)Guide,the different stages in the life of a project are referred to as ________.

(Multiple Choice)
5.0/5
(31)

Knowledge areas of the Project Management Body of Knowledge (PMBOK®)Guide refer to the factors in a project that need to be managed throughout the life of the project.

(True/False)
4.7/5
(42)

A(n)________ is the sequence of activities that determine the earliest date by which a project can be completed.

(Multiple Choice)
4.8/5
(31)

________ refers to a set of management policies,practices,and tools that developers use to maintain control over a project's resources.

(Multiple Choice)
4.9/5
(33)

In the context of a systems development project,which of the following statements is true of the relationships between requirements,cost,and time?

(Multiple Choice)
4.9/5
(40)

Which of the following statements is true of large-scale systems development projects?

(Multiple Choice)
4.8/5
(39)

Which of the following is a characteristic of large-scale systems development projects?

(Multiple Choice)
4.9/5
(41)

A(n)________ is a hierarchy of the tasks required to complete a project.

(Multiple Choice)
4.9/5
(47)

The smaller and shorter a project,the greater the chance of disruption due to unanticipated events.

(True/False)
4.8/5
(30)

What are the trade-offs in a systems development project's requirements,cost,and time?

(Essay)
4.9/5
(32)

________ is the knowledge area that refers to the management of an entire project and the construction of the final product.

(Multiple Choice)
4.9/5
(38)

Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.

(True/False)
4.8/5
(25)

What is a critical path? How is a critical path analysis done?

(Essay)
4.8/5
(37)

Which of the following tools shows the tasks,dates,and dependencies in a project?

(Multiple Choice)
4.8/5
(41)

What are the biggest challenges for managing a large-scale systems development project?

(Essay)
4.9/5
(34)

What are the characteristics of information systems (IS)in large-scale systems development projects?

(Essay)
4.8/5
(32)