Exam 16: Production Scheduling for Manufacturing and Service Operations
Exam 1: Product Line Planning and the Systems Approach114 Questions
Exam 2: Productivity and Strategic Planning115 Questions
Exam 3: Demand Creation and Predictive Planning114 Questions
Exam 4: Understanding Quality: ITS Management and Strategic Importance114 Questions
Exam 5: Process Configuration Strategies111 Questions
Exam 6: Process Analysis and Redesign115 Questions
Exam 7: Quality Assurance115 Questions
Exam 8: Management of Technology Mot101 Questions
Exam 9: Teamwork Planning Requires Job Design113 Questions
Exam 10: Supply Chain Capacity Planning113 Questions
Exam 11: Facilities Planning: Location and Layout112 Questions
Exam 12: Materials Management Impacts All Supply Chain Participants110 Questions
Exam 13: Aggregate Planning to Balance Supply and Demand106 Questions
Exam 14: Inventory Management for Smooth and Continuous Demand Patterns114 Questions
Exam 15: Material Requirements Planning Mrp for Sporadic Demand Patterns116 Questions
Exam 16: Production Scheduling for Manufacturing and Service Operations116 Questions
Exam 17: Cycle-Time Management Increases Productivity117 Questions
Exam 18: Project Management for New Products and Processes110 Questions
Exam 19: Change Management With Faster Project Completions103 Questions
Exam 20: Sustainability Issues: Environment, Ethics, and Security111 Questions
Select questions type
For the transportation model in Section 16-5 of the text,which of the symbols below is the profit per piece for each i,j cell?
(Multiple Choice)
4.8/5
(42)
Master production scheduling answers the question: Which department is going to do what work?
(True/False)
4.8/5
(26)
What are the advantages and disadvantages of using the assignment method?
(Essay)
4.8/5
(30)
When sequencing models are used,it is assumed that (tᵢ) includes: 1.job set-up time,2.work processing or operations times,and 3.waiting times.
(True/False)
4.9/5
(37)
The systems approach is called for so that the total number of assignments that are made by the scheduler is minimized.
(True/False)
4.8/5
(38)
_____ decisions must often be made with fast data scans that rely on the assistance of graphics such as the Gantt load chart.
(Multiple Choice)
4.9/5
(39)
What ratio is produced when each job's operation time tᵢ is divided by the relative importance of that job,wᵢ?
(Multiple Choice)
4.9/5
(39)
To reduce wastefulness of queues,the OPT system (optimum production technique,aka optimized production technology,aka the theory of constraints) recommends feeding the bottleneck.
(True/False)
4.9/5
(38)
The executive offices for five vice presidents of an airline are on the tenth floor of the airline's building.The decision is made to assign the offices in such a way as to maximize total satisfaction.Each VP is asked to rank his or her preferences for the available offices.One is the most preferred location (lowest cost) and five is the least preferred (highest cost).The data are as follows:
What is the best assignment plan from the company's viewpoint? How does this problem relate to production scheduling? How does this problem relate to service scheduling?

(Essay)
4.9/5
(42)
To create standard hours it is not necessary to assume that strict proportionality exists between the productivity rates of the machines.
(True/False)
4.7/5
(39)
Small benefits in highly repetitive environments can add up to a substantial cash savings or profit accumulation.
(True/False)
4.7/5
(41)
P/OM decisions must often be made with fast data scans,also know as eyeballing,that rely on the assistance of charts such as the Gantt load chart.
(True/False)
4.9/5
(44)
The reason that the best possible assignments cannot be made for every job is
(Multiple Choice)
4.8/5
(33)
Variability of the order mix is a factor in planning capacity which requires taking corrective actions during aggregate scheduling.
(True/False)
4.9/5
(36)
Over time,facilities need to be altered in such a way as to _____ the degree of _____.
(Multiple Choice)
5.0/5
(40)
As the number of facilities through which jobs must pass becomes large,sequencing models become increasingly difficult to handle with which of the following?
(Multiple Choice)
4.7/5
(44)
The assignment model provides solutions when jobs compete for facilities and where it is desirable to split some job assignments.
(True/False)
4.7/5
(32)
Showing 21 - 40 of 116
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)