Exam 16: Production Scheduling for Manufacturing and Service Operations

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The flow shop system is pre-designed to optimize production throughput by using synchronization of the production schedule at all workstations.

(True/False)
4.8/5
(38)

When the British refer to a billion euros,this is equivalent to _____ euros to Americans.

(Multiple Choice)
4.8/5
(37)

The matrix of costs per part for jobs 7,8,and 9 if assigned at facilities A,B,and C of the Rivet and Nail Factory is described by the matrix: The matrix of costs per part for jobs 7,8,and 9 if assigned at facilities A,B,and C of the Rivet and Nail Factory is described by the matrix:     The jobs are all of the same size (5,000 units) and duration.What relatively permanent assignments will minimize total costs? The jobs are all of the same size (5,000 units) and duration.What relatively permanent assignments will minimize total costs?

(Essay)
4.9/5
(36)

Flow control can result in smaller lot sizes being made more often.This is called

(Multiple Choice)
4.8/5
(31)

FIFO is an appealing sequencing policy because it seems to be the fairest rule to follow.Sometimes-to emphasize the fair treatment sense-it is called "first-come,first-serve" (FCFS).

(True/False)
4.8/5
(34)

The rows in the Gantt load chart represent what kinds of resources?

(Multiple Choice)
4.7/5
(43)

_____ developed resource plans based on forecasts of orders in generic units such as standard hours.

(Multiple Choice)
5.0/5
(38)

Shifting of job requirements can lead to an unbalanced load among departments which often happens after decisions have been made which tend to be irreversible.

(True/False)
5.0/5
(37)

The chart that reserves specific times at the various facilities for the actual jobs that have been assigned is called a _____ chart.

(Multiple Choice)
5.0/5
(39)

Variability in the loading mix is a difficult problem because the time for resource planning is long past.

(True/False)
4.9/5
(34)

What no-splitting-allowed method provides production schedulers with a decision model for matching jobs with facilities in an optimal way?

(Multiple Choice)
4.9/5
(35)

Time buffers are the same as stock buffers: They both specify the amount of work that the bottleneck can keep doing if any of its other suppliers are shut off.

(True/False)
4.7/5
(30)

In general,the time scale on the Gantt load chart is labeled in _____.

(Multiple Choice)
4.8/5
(34)

The final step of production scheduling assigns actual jobs to designated facilities with unambiguous stipulations that they be completed at specific times.

(True/False)
4.9/5
(30)

Often the revenue is rⱼ because it is a function of the job,j,and not the machine,i.

(True/False)
4.8/5
(41)

If the average completion tim If the average completion tim   e is as small as possible,the average customer's order is delayed the minimum necessary time.This can be a primary objective in determining rational sequence priorities. e is as small as possible,the average customer's order is delayed the minimum necessary time.This can be a primary objective in determining rational sequence priorities.

(True/False)
4.8/5
(37)

In the V process,work begins upstream at the tributaries and flows downstream to the trunk,encountering various bottlenecks along the way.

(True/False)
4.8/5
(34)

A determinant of what type of job shop system exists is

(Multiple Choice)
4.9/5
(40)

What are the advantages of the assignment method for production scheduling and for services?

(Essay)
4.8/5
(30)

On the Gantt load chart,bars and lines,running _____ convey various kinds of information designed to help the department schedule its production needs.

(Multiple Choice)
4.7/5
(37)
Showing 81 - 100 of 116