Exam 16: Production Scheduling for Manufacturing and Service Operations
Exam 1: Product Line Planning and the Systems Approach114 Questions
Exam 2: Productivity and Strategic Planning115 Questions
Exam 3: Demand Creation and Predictive Planning114 Questions
Exam 4: Understanding Quality: ITS Management and Strategic Importance114 Questions
Exam 5: Process Configuration Strategies111 Questions
Exam 6: Process Analysis and Redesign115 Questions
Exam 7: Quality Assurance115 Questions
Exam 8: Management of Technology Mot101 Questions
Exam 9: Teamwork Planning Requires Job Design113 Questions
Exam 10: Supply Chain Capacity Planning113 Questions
Exam 11: Facilities Planning: Location and Layout112 Questions
Exam 12: Materials Management Impacts All Supply Chain Participants110 Questions
Exam 13: Aggregate Planning to Balance Supply and Demand106 Questions
Exam 14: Inventory Management for Smooth and Continuous Demand Patterns114 Questions
Exam 15: Material Requirements Planning Mrp for Sporadic Demand Patterns116 Questions
Exam 16: Production Scheduling for Manufacturing and Service Operations116 Questions
Exam 17: Cycle-Time Management Increases Productivity117 Questions
Exam 18: Project Management for New Products and Processes110 Questions
Exam 19: Change Management With Faster Project Completions103 Questions
Exam 20: Sustainability Issues: Environment, Ethics, and Security111 Questions
Select questions type
Profit opportunity cost is the cost of assigning a job to a facility that results in not having the best possible profit.The opportunity cost is the difference between best and actual.
(True/False)
4.8/5
(35)
The span of protection in TOC is called the _____.It is varied to protect (plant activities) against disruption of the production processes.
(Multiple Choice)
4.9/5
(42)
Loading assigns work at the facilities and specifies the order in which jobs should be done.
(True/False)
4.9/5
(41)
The costs of not making the best possible assignments of a set of jobs to facilities and vice verse are opportunity costs.
(True/False)
4.9/5
(38)
When the SMH index is multiplied by the actual machine hours available per week,the _____ are obtained.
(Multiple Choice)
4.9/5
(34)
The bottleneck's processing rate is called _____ because _____.
(Multiple Choice)
4.9/5
(37)
If jobs are the rows and facilities are the columns of an assignment problem,(see Table 16-1),then _____ yields the opportunity costs at a given facility for assigning various jobs that are not the best jobs for that facility. 

(Multiple Choice)
4.9/5
(35)
Bottlenecks need to be taken into account,and the goal of synchronized manufacturing requires coordination of the entire job shop with respect to the mix of jobs that is being orchestrated.
(True/False)
4.8/5
(42)
The matrix of total costs per day for jobs 1,2,and 3-if assigned at facilities A,B,and C of the Rivet and Nail Factory-is:
What relatively permanent assignments will minimize total costs per day?

(Essay)
4.7/5
(28)
In column subtraction for finding the best jobs at a specific facility,column subtraction yields the opportunity costs at a given facility for assigning jobs that _____.
(Multiple Choice)
4.8/5
(33)
The average amount of time it takes to complete each job in the group is the mean flow time.
(True/False)
4.8/5
(44)
If the average completion tim
e is as small as possible,the average customer's order is delayed the minimum necessary time.This can be a primary objective in determining rational loading priorities.

(True/False)
4.9/5
(27)
In facility loading,when work that is scheduled is not completed on time,_____.
(Multiple Choice)
4.8/5
(38)
_____ are essential to balance out the production differences between making simple and complex product.
(Multiple Choice)
4.9/5
(42)
Production scheduling plans are accomplished by the shop loading function and the sequencing function for the job shop.
(True/False)
4.9/5
(36)