Exam 16: Production Scheduling for Manufacturing and Service Operations

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Gantt charts deal with the system's realities of loading for production scheduling.

(True/False)
4.9/5
(38)

Sequencing answers the question: What is the order in which the work will be done?

(True/False)
5.0/5
(39)

To reduce the wastefulness of jobs waiting in queues,the _____ system recommends feeding the bottleneck.

(Multiple Choice)
4.8/5
(40)

When split assignments are allowed,the transportation method cannot be used.Instead,turn to the assignment method.

(True/False)
4.9/5
(36)

_____ flow time is composed of the sum of the complete-to-ship times for each job in the group.

(Multiple Choice)
4.9/5
(40)

Sequencing jobs according to their shortest processing times is called the

(Multiple Choice)
4.9/5
(35)

Differentiate between total flow time and mean flow time.

(Essay)
4.9/5
(36)

The bottleneck's processing rate is called the _____ in OPT and TOC terms.

(Multiple Choice)
5.0/5
(38)

The Gantt layout chart is updated once a week.

(True/False)
4.9/5
(34)

A major objective of loading is to spread the load so that waiting is minimized,flow is smooth and slow,and congestion is avoided.

(True/False)
4.9/5
(34)

Define loading.What is the importance of loading?

(Essay)
4.8/5
(36)

Which is a difference between loading and sequencing?

(Multiple Choice)
4.9/5
(32)

The restrictive assumption is that the SMH index for each machine applies to all jobs.This is called the

(Multiple Choice)
4.8/5
(33)

Time reserves are maintained by means of the communication links that the managers of finite scheduling call ropes.

(True/False)
4.8/5
(40)

Define sequencing.How is it used?

(Essay)
4.9/5
(43)

When work is going to be late,or it is expected to miss the due date,it is said to be

(Multiple Choice)
4.9/5
(41)

Shop floor control is part of

(Multiple Choice)
4.7/5
(39)

What kinds of information do Gantt load charts provide?

(Essay)
4.8/5
(35)

Good Gantt charting prevents split assignments that improve productivity and quality.

(True/False)
4.9/5
(37)

Production scheduling is always a system's problem because _____ compete with each other for the best facilities.

(Multiple Choice)
4.8/5
(29)
Showing 41 - 60 of 116