Exam 16: Production Scheduling for Manufacturing and Service Operations
Exam 1: Product Line Planning and the Systems Approach114 Questions
Exam 2: Productivity and Strategic Planning115 Questions
Exam 3: Demand Creation and Predictive Planning114 Questions
Exam 4: Understanding Quality: ITS Management and Strategic Importance114 Questions
Exam 5: Process Configuration Strategies111 Questions
Exam 6: Process Analysis and Redesign115 Questions
Exam 7: Quality Assurance115 Questions
Exam 8: Management of Technology Mot101 Questions
Exam 9: Teamwork Planning Requires Job Design113 Questions
Exam 10: Supply Chain Capacity Planning113 Questions
Exam 11: Facilities Planning: Location and Layout112 Questions
Exam 12: Materials Management Impacts All Supply Chain Participants110 Questions
Exam 13: Aggregate Planning to Balance Supply and Demand106 Questions
Exam 14: Inventory Management for Smooth and Continuous Demand Patterns114 Questions
Exam 15: Material Requirements Planning Mrp for Sporadic Demand Patterns116 Questions
Exam 16: Production Scheduling for Manufacturing and Service Operations116 Questions
Exam 17: Cycle-Time Management Increases Productivity117 Questions
Exam 18: Project Management for New Products and Processes110 Questions
Exam 19: Change Management With Faster Project Completions103 Questions
Exam 20: Sustainability Issues: Environment, Ethics, and Security111 Questions
Select questions type
Gantt charts deal with the system's realities of loading for production scheduling.
(True/False)
4.9/5
(38)
Sequencing answers the question: What is the order in which the work will be done?
(True/False)
5.0/5
(39)
To reduce the wastefulness of jobs waiting in queues,the _____ system recommends feeding the bottleneck.
(Multiple Choice)
4.8/5
(40)
When split assignments are allowed,the transportation method cannot be used.Instead,turn to the assignment method.
(True/False)
4.9/5
(36)
_____ flow time is composed of the sum of the complete-to-ship times for each job in the group.
(Multiple Choice)
4.9/5
(40)
Sequencing jobs according to their shortest processing times is called the
(Multiple Choice)
4.9/5
(35)
The bottleneck's processing rate is called the _____ in OPT and TOC terms.
(Multiple Choice)
5.0/5
(38)
A major objective of loading is to spread the load so that waiting is minimized,flow is smooth and slow,and congestion is avoided.
(True/False)
4.9/5
(34)
The restrictive assumption is that the SMH index for each machine applies to all jobs.This is called the
(Multiple Choice)
4.8/5
(33)
Time reserves are maintained by means of the communication links that the managers of finite scheduling call ropes.
(True/False)
4.8/5
(40)
When work is going to be late,or it is expected to miss the due date,it is said to be
(Multiple Choice)
4.9/5
(41)
Good Gantt charting prevents split assignments that improve productivity and quality.
(True/False)
4.9/5
(37)
Production scheduling is always a system's problem because _____ compete with each other for the best facilities.
(Multiple Choice)
4.8/5
(29)
Showing 41 - 60 of 116
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)