Exam 8: Measuring and Controlling Quality

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is NOT an indication of an out-of-control process?

Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
Verified

A

Defects per million opportunities (dpmo) = _____.

Free
(Multiple Choice)
4.8/5
(26)
Correct Answer:
Verified

C

What is a Kroger Quality Score?

Free
(Essay)
4.9/5
(36)
Correct Answer:
Verified

The Kroger Quality Score is a proprietary internal measurement that Kroger uses to populate a scorecard for each vendor depending on the typical standard of product they supply.This scorecard is an integral part of the negotiating process with the vendor when contracts are set in place.

Rolled throughput yield is the proportion of conforming units that results from a series of process steps.

(True/False)
4.8/5
(41)

Operators at the final stage of the syringe assembly process chose 35 consecutive observations for a capability study and arrived at an estimated minimum process capability index of:

(Multiple Choice)
5.0/5
(40)

The larger the sample size,the narrower the control limits.

(True/False)
4.9/5
(30)

In determining the method of sampling,samples should be chosen to be as heterogeneous as possible so that each sample reflects the system of common causes or assignable causes that may be present at that point in time.

(True/False)
4.9/5
(36)

For statistical process control,a good sampling method should always:

(Multiple Choice)
4.9/5
(36)

The _____ is used to monitor the centering of the process.

(Multiple Choice)
4.8/5
(31)

Explain the different stages involved in the manufacturing of individual syringes at the Midwest pharmaceutical company.

(Essay)
4.8/5
(28)

c-charts are based on the _____ probability distribution.

(Multiple Choice)
4.9/5
(36)

Kroger Company uses a specification book that describes the _____ of all products carried by the company.

(Multiple Choice)
4.8/5
(34)

What were the conclusions drawn by the statistical consultants using the R-chart?

(Essay)
4.9/5
(27)

A nonconforming unit of work is one that has no defects or errors.

(True/False)
4.7/5
(32)

To form rational subgroups for an To form rational subgroups for an   -chart,the goal is to choose the samples as _____ as possible. -chart,the goal is to choose the samples as _____ as possible.

(Multiple Choice)
4.9/5
(35)

If the cost of investigating an operation to identify the cause of an apparent out-of-control condition is low,narrower control limits should be selected.

(True/False)
4.8/5
(33)

A specification is 50.0 cm ±\pm 10.0 cm.Sketch and label the pre-control zones for this specification.Include the following values on your sketch: nominal,upper and lower specification limits,and end points of the green zone.

(Essay)
4.9/5
(28)

In pre-control,which zone covers the nominal specification of a process?

(Multiple Choice)
4.8/5
(36)

Which of the following is NOT one of the basic applications of a control chart?

(Multiple Choice)
4.9/5
(26)

A measurement system may be precise but not necessarily accurate at the same time.

(True/False)
4.8/5
(38)