Discuss the differences between attributes and variables data.

(Essay)
4.8/5
(37)

Attribute measurement requires a much larger sample size than variable measurement to obtain the same amount of statistical information.

(True/False)
4.9/5
(31)

Process capability indices cannot be computed from data in an Process capability indices cannot be computed from data in an    -chart. -chart.

(True/False)
4.9/5
(34)

A company wishes to monitor the variation in the length of time it takes to process and send a bill to a customer.Seven bills will be randomly selected each day for a 60-day period and the length of time it takes to process and send the bill to a customer will be recorded for each bill.The appropriate control chart is a(n):

(Multiple Choice)
4.8/5
(33)

Which of the following charts is used to monitor the average number of nonconformances per unit when sample sizes vary?

(Multiple Choice)
4.9/5
(36)

What is the conclusion Kroger company arrived at after initiating the Lean Six Sigma project?

(Essay)
4.9/5
(40)

For variables data,the sample means are assumed to be:

(Multiple Choice)
4.9/5
(34)

A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ±\pm 0.25 cm.The company has established an  A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50   \pm  0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 37.35 cm and 1.05 cm,respectively.What is the value of C<sub>pk</sub> for this process? -chart and an R-chart using samples of size five.The center lines for the  A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50   \pm  0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 37.35 cm and 1.05 cm,respectively.What is the value of C<sub>pk</sub> for this process? -chart and R-chart are set at 37.35 cm and 1.05 cm,respectively.What is the value of Cpk for this process?

(Multiple Choice)
4.8/5
(34)

_____ is a study of variation in a measurement system using statistical analysis.

(Multiple Choice)
4.9/5
(36)

Which of the following is a likely cause of the control chart pattern known as a "trend?"

(Multiple Choice)
4.9/5
(38)

If points on a control chart are determined to be the result of special causes,the points should be eliminated and new control limits should be computed.

(True/False)
4.7/5
(32)

Process capability calculations make little sense if the process:

(Multiple Choice)
4.8/5
(33)

A(n) _____ characterizes the presence or absence of nonconformances in a unit of work.

(Multiple Choice)
5.0/5
(33)

A bank recently took 32 random samples of size 600 to determine the accuracy of its customer records.A customer record was considered to be nonconforming if any portion of the record was left blank.The sample data are presented below.Determine the control limits for an np-chart. A bank recently took 32 random samples of size 600 to determine the accuracy of its customer records.A customer record was considered to be nonconforming if any portion of the record was left blank.The sample data are presented below.Determine the control limits for an np-chart.

(Essay)
4.8/5
(49)

An alternative to using the R-chart is the:

(Multiple Choice)
4.9/5
(36)

A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ±\pm 0.25 cm.The company has established an  A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50   \pm  0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 35.25 cm and 1.08 cm,respectively.What is the value of C<sub>p</sub> for this process? -chart and an R-chart using samples of size five.The center lines for the  A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50   \pm  0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 35.25 cm and 1.08 cm,respectively.What is the value of C<sub>p</sub> for this process? -chart and R-chart are set at 35.25 cm and 1.08 cm,respectively.What is the value of Cp for this process?

(Multiple Choice)
4.8/5
(42)

A machined part has a lower specification limit of 3.5 inches and an upper specification limit of 3.9 inches.The range for the pre-control green zone is:

(Multiple Choice)
4.7/5
(33)

Twenty samples of size 6 were collected for a variable measurement.Determine the upper control limit (UCL) and lower control limit (LCL) for an R-chart if the sum of the sample ranges equals 88.0.

(Multiple Choice)
4.9/5
(29)

Which of the following is CORRECT regarding an x-chart?

(Multiple Choice)
4.8/5
(29)

The frequency of sampling in pre-control is often determined by dividing the time period between two successive out-of-control signals by six.

(True/False)
4.7/5
(39)