Exam 8: Scheduling Resources and Costs

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

These are all guidelines a project manager should consider when EXCEPT

(Multiple Choice)
4.9/5
(40)

When leveling schedules to overcome resource constraints, ___________ is increased.

(Multiple Choice)
4.9/5
(40)

When resource constraints are added to technical constraints the original project network may change as well as the completion date.

(True/False)
4.8/5
(30)

To determine if a project is time-constrained or resource-constrained you would consult the project priority matrix.

(True/False)
4.7/5
(32)

Since resource leveling or smoothing delays noncritical activities, a common result is a decrease in network sensitivity.

(True/False)
4.7/5
(41)

When a project is classified as resource-constrained and a resource constraint exists, the project duration is typically __________.

(Short Answer)
4.8/5
(40)

Comparing Planned Costs versus Actual Costs will give the project manager a quick understanding of the status of the project.

(True/False)
4.7/5
(32)

A project cost baseline is also called __________.

(Short Answer)
4.8/5
(34)

List and briefly describe the disadvantages of resource leveling or smoothing.

(Essay)
4.8/5
(30)

Most of the scheduling methods available today require the project manager to classify the project as either _______ constrained or ______ constrained.

(Multiple Choice)
4.8/5
(40)

The inability to fit more than two earth movers on a construction site at the same time when more are needed to complete the activity on time is an example of a physical constraint.

(True/False)
5.0/5
(30)

Having one person responsible for performing several activities, all due at the same time, is an example of a(n)________ constraint.

(Short Answer)
4.8/5
(36)

All leveling techniques delay noncritical activities by using ________ to reduce peak demand.

(Short Answer)
4.8/5
(34)

In a resource-constrained project the second priority in assigning resources is usually given to activities with the

(Multiple Choice)
4.9/5
(35)

Delaying noncritical activities to lower peak demand and, thus, increase resource utilization is called resource __________.

(Short Answer)
4.9/5
(37)

Resource dependency takes priority over technological dependency but it does not violate it.

(True/False)
4.8/5
(36)

Why is a schedule not a schedule until resources have been assigned? Provide a real life example that illustrates your explanation.

(Essay)
4.9/5
(30)

A project budget report is showing our project as spending $35,000 against a budgeted amount of $40,000.We can assume that everything is going as planned and that we are under budget.

(True/False)
4.8/5
(36)

Rachel is working on a project that technically allows three activities to be done at the same time.If they were to be implemented at the same time, she would need 5 contractors in order for the activities to be completed on time.There are only 3 available for her to use.This is an example of what type of constraint?

(Multiple Choice)
4.7/5
(40)

Jan is trying to reallocate resources in a time-constrained project to create smoother resource utilization.She should first identify activities with the

(Multiple Choice)
4.9/5
(37)