The project charter provides the project manager with written authority to use organizational resources for project activities.

Free
(True/False)
4.8/5
(39)
Correct Answer:
Verified

True

The definition of the end result or mission of your project, or what you expect to deliver to your customer when the project is complete is the project ___________.

Free
(Short Answer)
4.7/5
(28)
Correct Answer:
Verified

scope
Explanation: Your project scope should define the results to be achieved in specific, tangible, and measureable terms.

Identify and briefly describe the three categories used to classify the priority of major project parameters.

Free
(Essay)
4.7/5
(36)
Correct Answer:
Verified

(1)Constrain (the parameter is fixed).
(2)Enhance (the parameter should be optimized).
(3)Accept (lower results are acceptable).

The type of information that will need to be collected during a project and who will receive this information can be found in the project __________ plan.

(Short Answer)
4.9/5
(36)

For large companies, the organization breakdown structure is used rather than the work breakdown structure.

(True/False)
4.8/5
(33)

During the course of a project, it is possible that the project priorities may change.

(True/False)
4.8/5
(40)

A Process Breakdown Structure is a replacement for the Work Breakdown Structure for projects with tangible outcomes.

(True/False)
4.8/5
(34)

Which of the following is NOT one of the items that would appear on a project scope statement or checklist?

(Multiple Choice)
4.8/5
(23)

The WBS is best suited for projects that have a tangible outcome.Which of the following is used when the final outcome of the project is less tangible or is a product of a series of steps or phases?

(Multiple Choice)
4.9/5
(39)

Profit, time and performance are all basic classifications of project priorities.

(True/False)
4.9/5
(31)

A "Dissemination Mode" is

(Multiple Choice)
4.8/5
(40)

Responsibility matrices are used primarily with small and medium-sized projects and have limited use in large projects.

(True/False)
4.9/5
(35)

The most detailed element in the hierarchical breakdown of the project work to be accomplished is known as the __________.

(Short Answer)
4.8/5
(31)

There is a strong correlation between project success and clear project scope definition.

(True/False)
4.9/5
(40)

Define scope creep.When is it good? When is it bad? Provide real-life examples of both cases.

(Essay)
4.9/5
(36)

In regard to project priorities, if a project parameter such as the completion date or the cost of a project is fixed and must be met it is considered ____________.

(Short Answer)
4.9/5
(34)

The need for a functioning computer in countries having different electrical systems is an example of a ________.

(Short Answer)
4.8/5
(27)

Jose is looking at a document that outlines the specific deliverables and sub-deliverables required to complete the writing of a technical support manual.He is most likely viewing the

(Multiple Choice)
4.9/5
(30)

Taking advantage of opportunities to reduce costs or accelerate the schedule are examples of project criteria classified as ____________.

(Short Answer)
4.8/5
(40)

The first step in planning any project is to ___________.

(Short Answer)
4.8/5
(31)