Buffer stocks can help an organization respond quickly to increases in customer demand.

(True/False)
4.9/5
(32)

The effect of introducing self-managed teams is often an increase in efficiency of 30 percent or more,and sometimes much more.

(True/False)
5.0/5
(37)

The major advantage of total factor productivity is that each input is typically measured in the same units.

(True/False)
4.9/5
(32)

A production system is the system that an organization uses to acquire inputs,convert inputs into outputs,and dispose of the outputs.

(True/False)
4.8/5
(36)

Discuss the reasons why managers design production systems to be more responsive to customers.

(Essay)
4.9/5
(34)

Efficiency refers to goods and services that are reliable,dependable,and satisfying,and that do the job they were designed for.

(True/False)
4.8/5
(36)

In the production process,a jet airplane assembly line would be an example of a _____________ layout.

(Multiple Choice)
4.9/5
(41)

A system that an organization uses to obtain inputs,convert them into outputs,and then dispose of these outputs is known as a(n):

(Multiple Choice)
4.8/5
(38)

A technique that uses IT to develop an ongoing relationship with buyers to maximize the value an organization can deliver to them over time is ____________.

(Multiple Choice)
4.8/5
(37)

The engineers at Compaq Computer redesigned the ProLinea desktop computer so that its assembly time was reduced from 20.9 minutes to 10.5 minutes.This was a significant:

(Multiple Choice)
4.9/5
(39)

The outputs of an organization,divided by all of its inputs,is called its:

(Multiple Choice)
4.8/5
(40)

In a fixed-position production layout,each workstation is relatively self-contained.

(True/False)
4.9/5
(42)

Total factor productivity equals _____________.

(Multiple Choice)
4.8/5
(44)

In a process layout,machines are organized so that each operation needed is performed at workstations arranged in a fixed sequence.

(True/False)
5.0/5
(39)

What is process reengineering?

(Essay)
4.9/5
(26)

In the production process,when the workers are stationary and a moving conveyor belt takes the product on to the next workstation so that it is assembled in a fixed sequence,this is known as:

(Multiple Choice)
4.8/5
(32)

The people in the best position to identify opportunities for improving efficiency are:

(Multiple Choice)
4.8/5
(36)

Facilities layout is the operations management technique that pays minimal attention to design the machine-worker interface.

(True/False)
4.7/5
(38)

The operations management technique that attempts to reduce the machine setup costs in the production system is ____________.

(Multiple Choice)
4.7/5
(35)

In measuring the total factor productivity of an organization,an example of a measure of the amount of energy consumed in output production is the number of ____________.

(Multiple Choice)
4.9/5
(31)
Showing 81 - 100 of 112
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)