Exam 15: Project Management Online
Exam 1: Introduction to Modeling and Decision Analysis74 Questions
Exam 2: Introduction to Optimization and Linear Programming73 Questions
Exam 3: Modeling and Solving Lp Problems in a Spreadsheet75 Questions
Exam 4: Sensitivity Analysis and the Simplex Method77 Questions
Exam 5: Network Modeling84 Questions
Exam 6: Integer Linear Programming88 Questions
Exam 7: Goal Programming and Multiple Objective Optimization65 Questions
Exam 8: Nonlinear Programming and Evolutionary Optimization69 Questions
Exam 9: Regression Analysis82 Questions
Exam 10: Data Mining102 Questions
Exam 11: Time Series Forecasting81 Questions
Exam 12: Introduction to Simulation Using Analytic Solver Platform70 Questions
Exam 13: Queuing Theory87 Questions
Exam 14: Decision Analysis116 Questions
Exam 15: Project Management Online65 Questions
Select questions type
A company wants to use PERT to manage a project.They have developed the following spreadsheet for the problem.If The Risk Solver Platform RSP)is used,what formula should go in cell F3 of the spreadsheet to compute the Activity Time when simulating a PERT analysis?
A B C D E F G H I J K L 1 Time Random Activity Estimates 2 Act Number Time EST EFT LST LFT SLACK 3 A 8 10 14 0.73 11.46 0 11.462 0.00 11.46 0.00 ** 4 B 2 3 4 0.19 2.62 11.462 14.081 12.90 15.52 1.44 5 C 3 4 5 0.56 4.06 11.462 15.521 11.46 15.52 0.00 ** 6 5 8 12 0.94 10.72 15.521 26.24 15.52 26.24 0.00 ** 7 1 2 4 0.35 2.03 26.24 28.272 28.08 30.11 1.84 8 3 5 7 0.09 3.87 26.24 30.109 26.24 30.11 0.00 ** 9 1 2 3 0.59 2.09 30.109 32.202 30.11 32.20 0.00 **
(Multiple Choice)
4.8/5
(34)
Exhibit 15.3
The following questions are based on the information below.
A company needs to manage a project which consists of the following set of activities:
Days Predecessor Activity Required Activities A 5 - B 3 A C 4 A D 7 B, C E 6 C F 5 E G 4 D, F
-Refer to Exhibit 15.3.The following spreadsheet was developed to determine the earliest start times and latest start times for the project.Based on the data in the spreadsheet,which activities are on the critical path?
A B C D E F G H I 1 Activity Description Predecessor Time EST EFT LST LFT Slack 2 A Activity A 5 0 5 0 5 0 3 B Activity B A 3 5 8 10 13 5 4 C Activity C A 4 5 9 5 9 0 5 D Activity D B,C 7 9 16 13 20 4 6 E Activity E C 6 9 15 9 15 0 7 F Activity F E 5 15 20 15 20 0 8 G Activity G D, F 4 20 24 20 24 0
(Essay)
4.7/5
(32)
The purpose of the backward pass in the Critical Path Method CPM)technique is to
(Multiple Choice)
4.8/5
(24)
Which of the following correctly describes the focus of the Program Evaluation and Review Technique PERT)?
(Multiple Choice)
4.7/5
(36)
The purpose of the forward pass in the Critical Path Method CPM)technique is to
(Multiple Choice)
4.9/5
(36)
Exhibit 15.2
The following questions employ the AON network and completed spreadsheet below.
A B C D E F G H I 1 Activity Description Predecessor Time EST EFT LST LFT Slack 2 A Activity A 4 0 4 0 4 0 3 B Activity B A 3 4 7 4 7 0 4 C Activity C A 2 4 6 5 7 1 5 D Activity D B,C 7 7 14 7 14 0 6 E Activity E D 1 14 15 15 16 1 7 F Activity F D 2 14 16 14 16 0 8 G Activity G E,F 3 16 19 16 19 0
-Refer to Exhibit 15.2.What formula is placed in cell G5 to calculate the Latest Start Time?

(Multiple Choice)
5.0/5
(30)
If we are employing Activity-On-Arc AOA)network design,the arcs in the network diagram represent
(Multiple Choice)
4.8/5
(37)
What is the formula for the earliest finish time for activity i?
(Multiple Choice)
4.8/5
(30)
In a PERT network the time required to complete a path is an)
(Multiple Choice)
4.9/5
(43)
What formula should go in cell I5 of the following spreadsheet to compute Actual Time Between Starts?

(Multiple Choice)
4.8/5
(41)
Exhibit 15.3
The following questions are based on the information below.
A company needs to manage a project which consists of the following set of activities:
Days Predecessor Activity Required Activities A 5 - B 3 A C 4 A D 7 B, C E 6 C F 5 E G 4 D, F
-Refer to Exhibit 15.3.Manually determine the earliest and latest start and finish times for each activity and the amount of slack for each activity.What is the critical path for the project and how long should it take to complete it?
(Essay)
4.8/5
(30)
Exhibit 15.2
The following questions employ the AON network and completed spreadsheet below.
A B C D E F G H I 1 Activity Description Predecessor Time EST EFT LST LFT Slack 2 A Activity A 4 0 4 0 4 0 3 B Activity B A 3 4 7 4 7 0 4 C Activity C A 2 4 6 5 7 1 5 D Activity D B,C 7 7 14 7 14 0 6 E Activity E D 1 14 15 15 16 1 7 F Activity F D 2 14 16 14 16 0 8 G Activity G E,F 3 16 19 16 19 0
-Refer to Exhibit 15.2.Which of the following activities is not on the critical path for the network?

(Multiple Choice)
4.9/5
(26)
Activity-on-Arc AOA)networks do not allow multiple arcs with common start and finish nodes.If this must be represented,how is an AOA network modified?
(Multiple Choice)
4.9/5
(41)
A company wants to use PERT to manage a project.They have developed the following spreadsheet for the problem.What formula should go in cell F3 of the spreadsheet to compute the Activity Time when simulating a PERT analysis?
(Essay)
4.8/5
(27)