Exam 13: Project Evaluation and Control
Exam 1: Introduction: Why Project Management?103 Questions
Exam 2: The Organizational Context: Strategy,Structure,and Culture103 Questions
Exam 3: Project Selection and Portfolio Management99 Questions
Exam 4: Leadership and the Project Manager101 Questions
Exam 5: Scope Management103 Questions
Exam 6: Project Team Building,Conflict,and Negotiation102 Questions
Exam 7: Risk Management102 Questions
Exam 8: Cost Estimation and Budgeting102 Questions
Exam 9: Project Scheduling: Networks,Duration Estimation,and Critical Path105 Questions
Exam 10: Project Scheduling: Lagging, Crashing, and Activity Networks96 Questions
Exam 11: Advanced Topics in Planning and Scheduling: Agile and Critical Chain101 Questions
Exam 12: Resource Management99 Questions
Exam 13: Project Evaluation and Control104 Questions
Exam 14: Project Closeout and Termination101 Questions
Select questions type
-Use the S-curve to choose the BEST statement about the project it describes.The horizontal axis is in weeks.

(Multiple Choice)
4.9/5
(41)
The closer to completion a project gets,the less precise and useful is the information that EVM provides.
(True/False)
4.9/5
(38)
Use the earned value table for Project Makeready to calculate the estimated cost to completion. 

(Multiple Choice)
4.8/5
(31)
Duration (weeks) 5 10 15 20 25 \% Comp Conceptual Design 10 6 100\% Graphics Design 12 6 4 100\% Copyright 4 5 6 100\% Samples 4 2 70\% Tooling 6 9 4 50\% Production 2 6 14 20\% Total 10 18 22 26 24 Cumulative 10 28 50 76 100
-Use the data to calculate the earned value for the project.All amounts are in thousands of dollars.
(Multiple Choice)
4.9/5
(43)
In earned value management,schedule variance is defined as:
(Multiple Choice)
4.9/5
(38)
Use the earned value table (all amounts indicated are dollars)to determine the earned value to the nearest hundred dollars given the indicated state of the project. 

(Multiple Choice)
4.7/5
(38)
Use the data to calculate the schedule performance index for the project for the end of week 20.All amounts are in thousands of dollars. Duration (weeks) 5 10 15 20 25 \% Comp Conceptual Design 10 6 100\% Graphics Design 12 6 4 100\% Copyright 4 5 6 60\% Samples 4 2 100\% Tooling 6 9 4 50\% Production 2 6 14 20\% Total 10 18 22 26 24 Cumulative 10 28 50 76 100
(Multiple Choice)
4.7/5
(42)
Use the data to calculate the earned value for the project.All amounts are in thousands of dollars. Duration (weeks) 5 10 15 20 25 \% Comp Conceptual Design 10 6 100\% Graphics Design 12 6 4 75\% Copyright 4 5 6 5\% Samples 4 2 25\% Tooling 6 9 4 10\% Production 2 6 14 10\% Total 10 18 22 26 24 Cumulative 10 28 50 76 100
(Multiple Choice)
4.8/5
(39)
Which of these tools allows a project team to make future projections of project status based on its current state?
(Multiple Choice)
4.8/5
(36)
Each activity contained a series of milestones that represented a previously agreed-upon amount of work.Once the low graffiti was erased,35% of the activity had been completed and once the mid-level graffiti was erased,70% of the activity had been completed.This project manager was clearly in the:
(Multiple Choice)
4.7/5
(37)
How does a tracking Gantt chart's appearance differ from a standard Gantt chart?
(Multiple Choice)
4.8/5
(35)
What is the significance of the 0/100 rule and the 50/50 rule and why would each be used?
(Essay)
4.9/5
(41)
A recurring problem with establishing accurate or meaningful EVM results has to do with:
(Multiple Choice)
4.9/5
(44)
Use the S-curve where the solid line is actual cost and the dashed line is budgeted cost to choose the BEST statement. 

(Multiple Choice)
4.9/5
(40)
Measurement mechanisms should include a clear definition of:
(Multiple Choice)
4.9/5
(38)
-Use the S-curve to choose the BEST statement about the project it describes.The horizontal axis is in weeks.

(Multiple Choice)
4.8/5
(38)
What are any four benefits to using milestones as a form of project control? What advantage do they hold over pure S-curve analysis?
(Essay)
4.8/5
(41)
Showing 81 - 100 of 104
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)