Exam 13: Project Evaluation and Control

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

  -Use the S-curve to choose the BEST statement about the project it describes.The horizontal axis is in weeks. -Use the S-curve to choose the BEST statement about the project it describes.The horizontal axis is in weeks.

(Multiple Choice)
4.9/5
(41)

The closer to completion a project gets,the less precise and useful is the information that EVM provides.

(True/False)
4.9/5
(38)

Use the earned value table for Project Makeready to calculate the estimated cost to completion. Use the earned value table for Project Makeready to calculate the estimated cost to completion.

(Multiple Choice)
4.8/5
(31)

Duration (weeks) 5 10 15 20 25 \% Comp Conceptual Design 10 6 100\% Graphics Design 12 6 4 100\% Copyright 4 5 6 100\% Samples 4 2 70\% Tooling 6 9 4 50\% Production 2 6 14 20\% Total 10 18 22 26 24 Cumulative 10 28 50 76 100 -Use the data to calculate the earned value for the project.All amounts are in thousands of dollars.

(Multiple Choice)
4.9/5
(43)

In earned value management,schedule variance is defined as:

(Multiple Choice)
4.9/5
(38)

Use the earned value table (all amounts indicated are dollars)to determine the earned value to the nearest hundred dollars given the indicated state of the project. Use the earned value table (all amounts indicated are dollars)to determine the earned value to the nearest hundred dollars given the indicated state of the project.

(Multiple Choice)
4.7/5
(38)

Project control should be:

(Multiple Choice)
4.8/5
(42)

Use the data to calculate the schedule performance index for the project for the end of week 20.All amounts are in thousands of dollars. Duration (weeks) 5 10 15 20 25 \% Comp Conceptual Design 10 6 100\% Graphics Design 12 6 4 100\% Copyright 4 5 6 60\% Samples 4 2 100\% Tooling 6 9 4 50\% Production 2 6 14 20\% Total 10 18 22 26 24 Cumulative 10 28 50 76 100

(Multiple Choice)
4.7/5
(42)

Use the data to calculate the earned value for the project.All amounts are in thousands of dollars. Duration (weeks) 5 10 15 20 25 \% Comp Conceptual Design 10 6 100\% Graphics Design 12 6 4 75\% Copyright 4 5 6 5\% Samples 4 2 25\% Tooling 6 9 4 10\% Production 2 6 14 10\% Total 10 18 22 26 24 Cumulative 10 28 50 76 100

(Multiple Choice)
4.8/5
(39)

Which of these tools allows a project team to make future projections of project status based on its current state?

(Multiple Choice)
4.8/5
(36)

Each activity contained a series of milestones that represented a previously agreed-upon amount of work.Once the low graffiti was erased,35% of the activity had been completed and once the mid-level graffiti was erased,70% of the activity had been completed.This project manager was clearly in the:

(Multiple Choice)
4.7/5
(37)

How does a tracking Gantt chart's appearance differ from a standard Gantt chart?

(Multiple Choice)
4.8/5
(35)

What is the significance of the 0/100 rule and the 50/50 rule and why would each be used?

(Essay)
4.9/5
(41)

A recurring problem with establishing accurate or meaningful EVM results has to do with:

(Multiple Choice)
4.9/5
(44)

What are drawbacks to a pure S-curve analysis?

(Essay)
4.9/5
(27)

Milestones are generally considered to be:

(Multiple Choice)
4.8/5
(32)

Use the S-curve where the solid line is actual cost and the dashed line is budgeted cost to choose the BEST statement. Use the S-curve where the solid line is actual cost and the dashed line is budgeted cost to choose the BEST statement.

(Multiple Choice)
4.9/5
(40)

Measurement mechanisms should include a clear definition of:

(Multiple Choice)
4.9/5
(38)

  -Use the S-curve to choose the BEST statement about the project it describes.The horizontal axis is in weeks. -Use the S-curve to choose the BEST statement about the project it describes.The horizontal axis is in weeks.

(Multiple Choice)
4.8/5
(38)

What are any four benefits to using milestones as a form of project control? What advantage do they hold over pure S-curve analysis?

(Essay)
4.8/5
(41)