Exam 28: Systems Development Project Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A ________ defines the boundaries of a system in a work breakdown structure (WBS).

(Multiple Choice)
4.8/5
(42)

Which of the following is a characteristic of large-scale systems development projects?

(Multiple Choice)
4.9/5
(31)

In the Project Management Body of Knowledge (PMBOK®)Guide, the different stages in the life of a project are referred to as ________.

(Multiple Choice)
4.7/5
(40)

Which of the following is a technique that stipulates phases and processes for constructing information systems (IS)but does not address the management of large-scale projects?

(Multiple Choice)
4.8/5
(34)

________ is a knowledge area that concerns contracts with outside vendors for services, materials, and outsourcing of functions.

(Multiple Choice)
4.8/5
(37)

Prototypes are examples of deliverables in a systems development project.

(True/False)
4.8/5
(22)

Scheduling a large-scale project is more difficult than scheduling individual projects.

(True/False)
4.8/5
(44)

What is a critical path? How is a critical path analysis done?

(Essay)
4.9/5
(31)

________ refers to a set of management policies, practices, and tools that developers use to maintain control over a project's resources.

(Multiple Choice)
4.9/5
(38)

Increasing the cost of a project can reduce the time required to complete the project up to a certain point, beyond which, the time required would increase due to ________.

(Multiple Choice)
4.7/5
(39)

Pete, a civil engineer, is appointed to build a state-of-the-art office building.He begins planning the design and construction of the building with his team.He estimates that the building would take six months to build and assigns work and material accordingly to the workers.In this scenario, Pete is specifying the ________.

(Multiple Choice)
4.9/5
(32)

The smaller and shorter a project, the greater the chance of disruption due to unanticipated events.

(True/False)
4.9/5
(38)

The development of large-scale systems can involve the integration of products and services from different companies.

(True/False)
4.8/5
(26)

The time involved in a project can always be reduced by increasing cost.

(True/False)
4.9/5
(38)

The challenges of managing large-scale systems development projects arise from ________.

(Multiple Choice)
4.7/5
(33)

In the context of a systems development project, which of the following statements is true of the relationships between requirements, cost, and time?

(Multiple Choice)
4.7/5
(36)

Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.

(True/False)
4.9/5
(37)

Systems development projects require the balancing of three critical drivers: requirements, cost, and ________.

(Multiple Choice)
4.8/5
(35)

What are the characteristics of information systems (IS)in large-scale systems development projects?

(Essay)
4.9/5
(28)

A function point is a feature or function of a new program.

(True/False)
4.8/5
(31)
Showing 21 - 40 of 44
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)