Exam 16: Quality Control and Spc

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

An airline found that on average, 0.62% of the luggage they received from passengers at LAX( Los Angeles Airport) is lost or damaged. On a typical day, 1000 pieces of luggage pass through this airport. The upper control limits for a p chart for monitoring the daily fraction nonconforming?

(Essay)
4.9/5
(37)

Which is not related to a discrete metric?

(Multiple Choice)
4.9/5
(40)

Explain and give the significance of the 1:10:100 Rule.

(Essay)
4.8/5
(34)

A bottling process sometimes results in overfills or underfills. Overfills are especially damaging to the equipment. Which process capability index would this company most want to monitor?

(Multiple Choice)
4.8/5
(44)

Common cause variation is

(Multiple Choice)
4.9/5
(34)

If the mean in the range chart shifts down significantly, it indicates that the variation in the process has decreased.

(True/False)
4.8/5
(41)

Explain the issues associated with selecting the appropriate sample size and sampling frequency for control charts.

(Essay)
4.7/5
(32)

Honda wants to monitor the number of blemishes scratches, blisters, etc.) on the fenders of its cars using a statistical process control chart. The most appropriate type of SPC chart is

(Multiple Choice)
4.9/5
(40)

Special cause variation tends to be easily detectable using statistical methods.

(True/False)
4.8/5
(39)

Both the p-chart and the c-chart use variable data.

(True/False)
4.7/5
(34)

Common cause variation

(Multiple Choice)
4.8/5
(35)

A production process is sampled 24 times with a sample size of 6 yields an overall mean of 25.2 and an average range of 0.8. Determine the control limits for the x-bar and R charts.

(Essay)
4.9/5
(38)

Which of the following is not related to a continuous metric?

(Multiple Choice)
4.9/5
(36)

With good management, all variability of output from any goods- or service-producing process can be eliminated.

(True/False)
4.9/5
(36)

If no special causes affect the output of a process, we say that the process is ____; when special causes are present, the process is said to be ____.

(Multiple Choice)
4.7/5
(36)

Indications in a control chart of an out-of-control situation include all of the following except

(Multiple Choice)
4.9/5
(33)

In the 1:10:100 Rule, which of the following would be correct?

(Multiple Choice)
4.7/5
(33)

An xˉ\bar { x } -chart is always analyzed first because the control limits in the R-chart depend on the mean xˉ\bar{ x } ) of the data.

(True/False)
4.8/5
(40)

A key element of a control system is the ability to measure performance and compare it to a performance standard.

(True/False)
4.7/5
(46)

Regarding special cause variability, all are true except

(Multiple Choice)
4.8/5
(38)
Showing 41 - 60 of 86
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)