Exam 17: Lean Operating Systems
Exam 1: Goods, Services, and Operations Management65 Questions
Exam 2: Value Chains68 Questions
Exam 3: Measuring Performance in Operations80 Questions
Exam 4: Operations Strategy65 Questions
Exam 5: Technology and Operations Management72 Questions
Exam 6: Goods and Service Design92 Questions
Exam 7: Process Selection, Design, and Analysis88 Questions
Exam 8: Facility and Work Design79 Questions
Exam 9: Supply Chain Design71 Questions
Exam 10: Capacity Management70 Questions
Exam 11: Forecasting and Demand Planning76 Questions
Exam 12: Managing Inventories89 Questions
Exam 13: Resource Management88 Questions
Exam 14: Operations Scheduling and Sequencing66 Questions
Exam 15: Quality Management73 Questions
Exam 16: Quality Control and Spc86 Questions
Exam 17: Lean Operating Systems63 Questions
Exam 18: Project Management65 Questions
Exam 19: Work Measurement, Learning Curves, and Standards56 Questions
Exam 20: Queuing Analysis39 Questions
Exam 21: Modeling Using Linear Programming43 Questions
Exam 22: Simulation39 Questions
Exam 23: Work Measurement, Learning Curves, and Standards44 Questions
Select questions type
Lean Six Sigma is simply the union of lean approaches with quality improvement techniques, each of which has been used independently in other applications.
Free
(True/False)
4.8/5
(27)
Correct Answer:
True
According to the Toyota Motor Company, waiting time is a necessary evil in production and is not classified as waste.
Free
(True/False)
4.8/5
(33)
Correct Answer:
False
Which of the following is not a basic principle of a lean operating system?
(Multiple Choice)
4.8/5
(28)
JIT systems are based on the concept associated with pull systems rather than push systems.
(True/False)
4.9/5
(38)
Toyota classified waste into seven major categories. Those categories include all of the following except
(Multiple Choice)
4.8/5
(34)
Total productive maintenance (TPM) seeks to do all of the following except ____.
(Multiple Choice)
4.9/5
(36)
The 5Ss focus on improving waste generated by inefficient transportation.
(True/False)
4.9/5
(45)
A clean and organized work area is an important principle of lean thinking.
(True/False)
4.9/5
(39)
Hinge Manufacturing Company employs a Kanban system for a component part. The daily demand is 900 hinges. Each container has a wait time of 0.05/day, and a processing time of 0.37 days. The Container size is 60 hinges and the safety factor ( ) is 10%.
a.How many Kanban card sets should be authorized?
b.What is the maximum inventory of this hinge in the system?
(Essay)
4.9/5
(35)
The number of Kanban cards is directly proportional to the amount of work-in-process inventory.
(True/False)
4.8/5
(26)
Firms use the "5S" principles to create a clean and organized work environment.
(True/False)
4.7/5
(35)
How does Total Productive Maintenance TPM) affect lean operating systems?
(Essay)
4.8/5
(33)
Which one of the following statements is true concerning Lean Six Sigma?
(Multiple Choice)
4.8/5
(31)
In a Kanban system, the numerator of the formula K =[(dp + w)(1 + )]/C is analogous to
(Multiple Choice)
4.9/5
(37)
Principles of lean operating systems include all of the following except
(Multiple Choice)
4.9/5
(24)
Long lead-times and higher work-in-process is most closely related to which of Toyota's "Seven Major Waste Categories?"
(Multiple Choice)
4.7/5
(35)
Showing 1 - 20 of 63
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)