Exam 20: Master Scheduling and Rough-Cut Capacity Planning
Exam 1: Introduction to Operations Management133 Questions
Exam 2: Operations Strategy and Competitiveness134 Questions
Exam 3: Product Design and Process Selection131 Questions
Exam 4: Supply Chain Management132 Questions
Exam 5: Total Quality Management141 Questions
Exam 6: Statistical Quality Control132 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting136 Questions
Exam 9: Capacity Planning and Facility Location139 Questions
Exam 10: Facility Layout130 Questions
Exam 11: Work System Design133 Questions
Exam 12: Inventory Management135 Questions
Exam 13: Aggregate Planning103 Questions
Exam 14: Resource Planning137 Questions
Exam 15: Scheduling135 Questions
Exam 16: Project Management136 Questions
Exam 17: Spreadsheet Modeling: An Introduction136 Questions
Exam 18: Introduction to Optimization130 Questions
Exam 19: Waiting Line Models130 Questions
Exam 20: Master Scheduling and Rough-Cut Capacity Planning69 Questions
Select questions type
To evaluate the MPS in terms of customer service, the master scheduler checks that:
(Multiple Choice)
4.8/5
(35)
What is the formula for calculating the ATP quantity at future replenishment periods?
(Multiple Choice)
4.9/5
(28)
Consider the following partial ATP MPS record. Beginning inventory is 40 units. The firm uses a fixed order quantity of 70 units. What is the projected available amount in period 2?


(Multiple Choice)
4.7/5
(39)
Consider the following partial MPS record. Beginning inventory is 60 units. When should the first MPS shipment be scheduled?


(Multiple Choice)
5.0/5
(32)
What is the portion of the MPS called that lies between the current time and the demand time fence?
(Multiple Choice)
4.9/5
(29)
What term refers to proven capacity calculated from actual performance data?
(Multiple Choice)
4.8/5
(37)
What data are added to create an extended MPS record that allows the firm to compute available-to-promise units?
(Multiple Choice)
4.8/5
(31)
The ______ _____ shows how many products or services are planned for each time period.
(Short Answer)
4.8/5
(32)
A primary objective of the master production schedule is to achieve the desired customer service level.
(True/False)
4.9/5
(35)
Consider the following partial MPS record. Beginning inventory is 80 units. When should the first MPS shipment be scheduled?


(Multiple Choice)
5.0/5
(34)
Consider the following partial MPS record. Beginning inventory is 100 units. When should the first MPS shipment be scheduled?


(Multiple Choice)
4.7/5
(41)
Johnny Now, Inc. produces two different models of outhouses. Demand next period is expected to be 12,000 and 18,000 units for Models A and B, respectively. Model A has CPOPF planning factors of 0.75 and 0.60 for direct labor and machine time, respectively. Model B has CPOPF planning factors of 0.50 and 0.80 for direct labor and machine time, respectively. Historically department G uses 24% of the direct labor and machine time for these products, while department H uses the remaining 76%. What is the direct labor time requirement for department G next period?
(Multiple Choice)
4.8/5
(31)
The available-to-promise row in an extended MPS record shows how many committed units the company has available for delivery at a given time.
(True/False)
4.9/5
(32)
What is the portion of the MPS called that lies between the demand time fence and the planning time fence?
(Multiple Choice)
4.8/5
(38)
In the "slushy" portion of the MPS, changes in the product mix are possible, but changes needing additional resources are not.
(True/False)
4.8/5
(43)
Engines Corp. builds two different types of motors in three departments. Historically, department X uses 20%, department Y uses 50%, and department Z uses 30% of direct labor and machine time, respectively. In the next quarter, demand for Model A is expected to be 40,000 units, and demand for Model B is expected to be for 50,000 units. The CPOPF planning factors are: direct labor for Model A = 0.667 hrs./unit, machine time for Model A = 1.75 hrs./unit, direct labor for Model B = 1.087 hrs./unit, machine time for Model B = 0.261 hrs./unit. Calculate the amount of labor and machine time that will need to be allocated to each of the three departments next quarter.
(Essay)
4.7/5
(32)
In the "liquid" portion of the MPS, the master scheduler generally has the authority to approve what changes?
(Multiple Choice)
4.8/5
(34)
The MPS is said to be ________________________ between final assembly and cumulative manufacturing lead times.
(Short Answer)
4.8/5
(43)
Showing 41 - 60 of 69
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)