Discuss the master scheduler's objectives when developing the MPS.

Free
(Essay)
4.9/5
(40)
Correct Answer:
Verified

Achieve the desired customer service level either by maintaining finished goods inventory or by scheduling completion of the item or service to meet the customer's delivery needs. Make the best use of the company's resources: material, labor, and equipment. Ensure that the inventory investment is at the appropriate level.

A master production schedule incorporates production lead time.

Free
(True/False)
4.9/5
(42)
Correct Answer:
Verified

False

Johnny Now, Inc. produces two different models of outhouses. Demand next period is expected to be 12,000 and 18,000 units for Models A and B, respectively. Model A has CPOPF planning factors of 0.75 and 0.60 for direct labor and machine time, respectively. Model B has CPOPF planning factors of 0.50 and 0.80 for direct labor and machine time, respectively. Historically department G uses 24% of the direct labor and machine time for these products, while department H uses the remaining 76%. What is the machine time requirement for department H next period?

Free
(Multiple Choice)
4.8/5
(38)
Correct Answer:
Verified

E

Describe what CPOPF is.

(Essay)
4.9/5
(28)

In the current period, Available-to-Promise adds ________________________ to the formula used for future periods.

(Short Answer)
4.8/5
(34)

The MPS is said to be ________________________ between the current time and the time needed for final assembly.

(Short Answer)
4.7/5
(40)

In MPS terminology, what is another name for the current period?

(Multiple Choice)
5.0/5
(27)

What is the formula for projected available when using ATP MPS records?

(Multiple Choice)
4.9/5
(42)

Consider the following partial MPS record. Beginning inventory is 0 units. The firm uses a fixed order quantity of 60 units. Fill out the last two rows of the table. Consider the following partial MPS record. Beginning inventory is 0 units. The firm uses a fixed order quantity of 60 units. Fill out the last two rows of the table.

(Essay)
4.9/5
(31)

Beginning Inventory + MPS Shipment - maximum of (forecast and customer orders) is called ________________________.

(Short Answer)
4.8/5
(31)

Consider the following partial MPS record. Beginning inventory is 40 units. The firm uses a fixed order quantity of 70 units. What is the projected available amount in period 5? Consider the following partial MPS record. Beginning inventory is 40 units. The firm uses a fixed order quantity of 70 units. What is the projected available amount in period 5?

(Multiple Choice)
4.9/5
(47)

What establishes a point of time in the future inside of which changes must be made by the master scheduler, and changes outside of which can be changed by system logic?

(Multiple Choice)
4.8/5
(29)

Motorsports, Inc. builds two different types of motors. Model A has averaged 20,000 units annually, and Model B has average 30,000 units annually. The firm has historically used 80,000 direct labor hours and 10,000 hours of machine time per year to build Model A. Also, 150,000 annual direct labor hours have been allocated to Model B, along with 60,000 hours of annual machine time. What is the CPOPF planning factor for direct labor for Model B?

(Multiple Choice)
4.8/5
(31)

Which of the following is not one of the rows in an MPS record?

(Multiple Choice)
4.8/5
(34)

The master production schedule is a statement of upcoming demand.

(True/False)
4.9/5
(28)

Discuss why a negative number in the available-to-promise row is always a problem.

(Essay)
4.8/5
(35)

Engines Corp. builds two different types of motors. Model A has averaged 120,000 units annually, and Model B has average 230,000 units annually. The firm has historically used 80,000 direct labor hours and 210,000 hours of machine time per year to build Model A. Also, 250,000 annual direct labor hours have been allocated to Model B, along with 60,000 hours of annual machine time. Calculate the four relevant CPOPF planning factors.

(Essay)
4.8/5
(37)

Demonstrated capacity is the ______ capacity ______ from the actual performance data.

(Multiple Choice)
4.7/5
(44)

Which of the following is not a direct input into the MRP system?

(Multiple Choice)
4.8/5
(41)

What is the formula for projected available in an MPS record?

(Multiple Choice)
4.9/5
(33)
Showing 1 - 20 of 69