Exam 16: Lean Systems
Exam 1: Introduction to Operations and Supply Chain Management74 Questions
Exam 2: Quality Management86 Questions
Exam 3: Statistical Process Control161 Questions
Exam 4: Product Design81 Questions
Exam 5: Service Design77 Questions
Exam 6: Processes and Technology48 Questions
Exam 7: Capacity and Facilities Design90 Questions
Exam 8: Human Resources85 Questions
Exam 9: Project Management98 Questions
Exam 10: Supply Chain Management Strategy and Design73 Questions
Exam 11: Global Supply Chain Procurement and Distribution96 Questions
Exam 12: Forecasting99 Questions
Exam 13: Inventory Management25 Questions
Exam 14: Sales and Operations Planning34 Questions
Exam 15: Resource Planning86 Questions
Exam 16: Lean Systems99 Questions
Exam 17: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 18: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 19: Operational Decision-Making Tools: Facility Location Models23 Questions
Exam 20: Operational Decision-Making Tools: Work Measurement29 Questions
Exam 21: Operational Decison-Making Tools: Transportation and Transshipment Models102 Questions
Exam 22: Operational Decision-Making Tools: Simulation84 Questions
Exam 23: Operational Decision-Making Tools: Linear Programming92 Questions
Select questions type
______________ are based on natural selection properties of genetics.
(Multiple Choice)
4.8/5
(36)
If the following jobs are sequenced according to the LPT rule then the maximum job tardiness (in days) is (assume zero for today's date) 

(Multiple Choice)
4.8/5
(29)
Minimizing overtime is one of several objectives that could be considered when constructing a schedule.
(True/False)
4.8/5
(39)
Employee scheduling has _____________ options compared to work scheduling because labor is a ______________ resource.
(Multiple Choice)
4.8/5
(38)
The following set of jobs must be processed serially through a two-step system. The times at each process are in hours. If Johnson's Rule is used to sequence the jobs then the makespan time (in hours) for all jobs is 

(Multiple Choice)
4.8/5
(36)
The class of software, with libraries of algorithms and heuristics from which to choose, has become known as
(Multiple Choice)
4.7/5
(32)
The following set of jobs must be processed serially through a two-step system. The times at each process are in hours. If Johnson's Rule is used to sequence the jobs then Job A would complete processing on operation 2 at 

(Multiple Choice)
4.8/5
(41)
If the following jobs are sequenced according to the FCFS rule then the mean tardiness (in days) for all jobs is (assume zero for today's date) 

(Multiple Choice)
4.8/5
(39)
All sequencing rules strive to optimize both processing efficiency and due date performance.
(True/False)
4.8/5
(43)
Sequencing involves determining the order in which jobs are released to the shop floor.
(True/False)
4.9/5
(42)
If the following jobs are sequenced according to the FCFS rule then the maximum job tardiness (in days) is (assume zero for today's date) 

(Multiple Choice)
4.8/5
(33)
In a job shop environment, the process of prioritizing jobs assigned to a productive resource is called sequencing.
(True/False)
4.9/5
(44)
The process of assigning work to limited resources is known as
(Multiple Choice)
4.7/5
(38)
If the following jobs are sequenced according to the SLACK rule then the maximum job tardiness (in days) is (assume zero for today's date) 

(Multiple Choice)
4.9/5
(28)
Gantt charts show the planned but not the completed activities against a time scale.
(True/False)
5.0/5
(35)
Job shop scheduling is usually performed by skilled machine operators.
(True/False)
4.8/5
(38)
A _______________ is shop paperwork that travels with the job.
(Multiple Choice)
4.9/5
(27)