Exam 16: Lean Systems
Exam 1: Introduction to Operations and Supply Chain Management74 Questions
Exam 2: Quality Management86 Questions
Exam 3: Statistical Process Control161 Questions
Exam 4: Product Design81 Questions
Exam 5: Service Design77 Questions
Exam 6: Processes and Technology48 Questions
Exam 7: Capacity and Facilities Design90 Questions
Exam 8: Human Resources85 Questions
Exam 9: Project Management98 Questions
Exam 10: Supply Chain Management Strategy and Design73 Questions
Exam 11: Global Supply Chain Procurement and Distribution96 Questions
Exam 12: Forecasting99 Questions
Exam 13: Inventory Management25 Questions
Exam 14: Sales and Operations Planning34 Questions
Exam 15: Resource Planning86 Questions
Exam 16: Lean Systems99 Questions
Exam 17: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 18: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 19: Operational Decision-Making Tools: Facility Location Models23 Questions
Exam 20: Operational Decision-Making Tools: Work Measurement29 Questions
Exam 21: Operational Decison-Making Tools: Transportation and Transshipment Models102 Questions
Exam 22: Operational Decision-Making Tools: Simulation84 Questions
Exam 23: Operational Decision-Making Tools: Linear Programming92 Questions
Select questions type
To maintain the synchronization required for theory of constraints, Goldratt introduced the concept of
(Multiple Choice)
4.8/5
(26)
If the following jobs are sequenced according to the LPT rule then the total number of jobs that would be late is (assume zero for today's date) 

(Multiple Choice)
4.7/5
(33)
_________________ provides the information to regulate the flow of work to and from a network of work centers.
(Multiple Choice)
4.8/5
(42)
The sequence in which jobs should be processed is typically determined using linear programming.
(True/False)
4.8/5
(37)
With _________________ scheduling, loading and sequencing decisions are made at the same time.
(Multiple Choice)
4.8/5
(41)
Identifying the bottleneck is the ______________ step in the theory of constraints scheduling procedure.
(Multiple Choice)
4.7/5
(42)
Tardiness is defined as the difference between a job's flow time and makespan.
(True/False)
4.9/5
(39)
Increasing the capacity of a work center that is a bottleneck increases output.
(True/False)
4.8/5
(41)
Scheduling is considered the first stage of the planning process.
(True/False)
4.9/5
(34)
Genetic algorithms are based on the natural selection properties of genetics.
(True/False)
4.8/5
(29)
The scheduling rule that minimizes the makespan time for a set of jobs that must be processed through a two-step system where every job follows the same sequence through the two processes is
(Multiple Choice)
4.8/5
(37)
Four products (1, 2, 3, and 4) must be processed on one of four machines (A, B, C, and D). The times required in minutes for each product on each machine are shown below.
If management assigns products to machines so that the total time to complete all jobs is minimized, then the time to complete Product 1 is

(Multiple Choice)
4.8/5
(35)
Which of the following is not typically considered an objective of scheduling?
(Multiple Choice)
4.8/5
(48)
Theory of constraints is a _____________ scheduling approach that concentrates on scheduling the bottleneck.
(Multiple Choice)
4.8/5
(38)
With drum-buffer-rope (DBR), the bottleneck resource is always the buffer.
(True/False)
4.8/5
(38)
If the following jobs are sequenced according to the SPT rule then the mean tardiness (in days) for all jobs is (assume zero for today's date) 

(Multiple Choice)
4.7/5
(39)
The process of assigning work to limited resources is known as scheduling.
(True/False)
4.8/5
(25)
The theory of constraints (TOC) approach to scheduling concentrates on scheduling the bottleneck resources.
(True/False)
4.8/5
(38)
If the following jobs are sequenced according to the DDATE rule then the maximum job tardiness (in days) is (assume zero for today's date) 

(Multiple Choice)
4.7/5
(39)
Showing 41 - 60 of 99