Throughput is defined as the difference between the sales and the operating expenses of a plant.

Free
(True/False)
4.9/5
(32)
Correct Answer:
Verified

True

Use a Gantt chart to schedule the jobs in order 1,2,3 and assume that jobs cannot be split.What is the makespan?

Free
(Multiple Choice)
4.9/5
(47)
Correct Answer:
Verified

A

Scheduling often deals with which three conflicting objectives?

Free
(Multiple Choice)
4.7/5
(29)
Correct Answer:
Verified

C

Which of the following statements is NOT true about finite capacity scheduling (FCS)?

(Multiple Choice)
4.7/5
(30)

First come,first served is widely used in both service and manufacturing firms.

(True/False)
4.8/5
(23)

Lead time for completion of a job is a function of both:

(Multiple Choice)
4.9/5
(44)

The SPT rule does a better job of meeting due dates when compared to the Critical Ratio rule.

(True/False)
4.7/5
(34)

Which of the following is NOT primarily determined by Gantt charting?

(Multiple Choice)
4.7/5
(39)

Finite Capacity Scheduling can be used to identify the bottleneck in a given process.

(True/False)
4.7/5
(40)

Optimal sequencing rules have found widespread use in practice.

(True/False)
4.7/5
(30)

Scheduling systems need NOT answer which of the following questions?

(Multiple Choice)
4.9/5
(35)

In the language of constraint management,inventory is:

(Multiple Choice)
4.8/5
(35)

Which of the following statements is incorrect about the theory of constraints (TOC)?

(Multiple Choice)
4.9/5
(35)

Theory of constraints,as it applies to business systems,is based on one major premise.Which of the following statements expresses that premise?

(Multiple Choice)
4.9/5
(30)

Finite capacity scheduling assumes which of the following?

(Multiple Choice)
4.8/5
(35)

A bottleneck is:

(Multiple Choice)
4.8/5
(34)

Aggregate planning and scheduling differ in that:

(Multiple Choice)
4.9/5
(34)

The theory of constraints (TOC)is:

(Multiple Choice)
4.8/5
(28)

Which of the following questions is NOT answered by the scheduling system?

(Multiple Choice)
4.7/5
(26)

According to Goldratt:

(Multiple Choice)
4.9/5
(31)