Exam 9: Quality Control and Improvement
Exam 1: The Operations Function25 Questions
Exam 2: Operations and Supply Chain Strategy26 Questions
Exam 3: Product Design27 Questions
Exam 4: Process Selection35 Questions
Exam 5: Service Process Design30 Questions
Exam 6: Process-Flow Analysis27 Questions
Exam 7: Lean Thinking and Lean Systems33 Questions
Exam 8: Managing Quality31 Questions
Exam 9: Quality Control and Improvement36 Questions
Exam 10: Supply Chain Management29 Questions
Exam 11: Forecasting31 Questions
Exam 12: Capacity Planning23 Questions
Exam 13: Scheduling Operations23 Questions
Exam 14: Project Planning and Scheduling22 Questions
Exam 15: Independent Demand Inventory30 Questions
Exam 16: Materials Requirements Planning and ERP30 Questions
Select questions type
Which of the following statements about process capability is accurate?
(Multiple Choice)
4.8/5
(36)
Attribute control occurs when the product characteristic is measured on a continuous scale.
(True/False)
4.8/5
(25)
Six sigma projects are typically managed by full-time black belts.
(True/False)
4.9/5
(38)
Suppose that you have taken 30 samples of 200 units each and calculated the proportion defective as p = .075.What is the upper control limit for a p-chart (rounded to 4 decimals)?
(Multiple Choice)
4.7/5
(37)
We need information only regarding the central tendency of the process while examining a continuous process.
(True/False)
4.8/5
(38)
Which of the following statements about process quality control is NOT true?
(Multiple Choice)
4.9/5
(33)
Which of the following statements is NOT true about six sigma quality?
(Multiple Choice)
4.9/5
(32)
Suppose that a process is in a state of control and we have the following information for a human weights measurement study. Average weight of males in the study = 150 lbs.
Average range of the male weights = 100 lbs.
A2 = .577
D3 = 0
D4 = 2.115
What is the upper control limit for the average (mean)chart?
(Multiple Choice)
4.8/5
(42)
Using the same data as in question 10,what is the lower control limit for a p-chart (rounded to 4 decimals)?
(Multiple Choice)
4.7/5
(30)
Which of the following techniques are used for continuous improvement?
(Multiple Choice)
4.8/5
(36)