Keith welds a one-fourth-inch diameter ball bearing and a three-eighths-inch diameter ball bearing on each end of an eighth-inch diameter cylinder.Sure,the work is tedious,but he knows he's doing his part keeping this country running and lining his employer's pockets with sweet cash.His employer hopes to speed up this activity by hiring another skilled worker,and in doing so will:

(Multiple Choice)
4.8/5
(39)

A project is represented by the activity durations (estimated at 90% likelihood of completion)and precedence requirements shown in the table.What is the overall duration of this project if it is managed using critical chain methodology? A project is represented by the activity durations (estimated at 90% likelihood of completion)and precedence requirements shown in the table.What is the overall duration of this project if it is managed using critical chain methodology?

(Multiple Choice)
4.9/5
(34)

The Central Limit Theorem says that if a number of probability distributions are summed:

(Multiple Choice)
4.8/5
(42)

If a project activity experiences positive variation:

(Multiple Choice)
4.7/5
(33)

Under the student syndrome model,the slope of the percentage completed curve:

(Multiple Choice)
4.8/5
(41)

The root cause of overinflated time estimates is a lack of trust within the project organization.

(True/False)
4.9/5
(45)

In classic project management,activity durations are estimated based on a(n)________% likelihood of successful completion,but in CCPM,activity estimates are at the ________% level.

(Essay)
4.8/5
(41)

Create and solve an example of at least three activities to explain the nefarious effects of multitasking.

(Essay)
4.8/5
(36)

An important element in critical chain scheduling is to change from a late-finish (procrastination)approach to an early-start approach.

(True/False)
4.8/5
(45)

What is the student syndrome and what makes it a useful model for highlighting common project efforts?

(Essay)
4.8/5
(31)

A project is represented by the activity durations (estimated at 90% likelihood of completion)and precedence requirements shown in the table.What is the overall duration of this project if it is managed using critical chain methodology? A project is represented by the activity durations (estimated at 90% likelihood of completion)and precedence requirements shown in the table.What is the overall duration of this project if it is managed using critical chain methodology?

(Multiple Choice)
4.9/5
(38)

If people believe that they built extra time into their initial estimates,they are usually more likely to begin project work right away.

(True/False)
4.7/5
(44)

A feeder buffer is a buffer that is created for a non-critical path activity.

(True/False)
4.9/5
(32)

In order to resolve a resource conflict,it is advisable to:

(Multiple Choice)
4.8/5
(38)

Which tendency is NOT a contributing factor to the student syndrome?

(Multiple Choice)
4.7/5
(42)

Describe three ways that project members routinely add safety to the estimated length of project activities.

(Essay)
4.8/5
(29)

In applying the principle of common cause variation to the theory of CCPM,it is important to:

(Multiple Choice)
4.8/5
(37)

Critical Chain Project Methodology ________ risk for the entire project.

(Essay)
4.7/5
(34)

A(n)________ refers to a safety margin separating different projects scheduled to use the same resource.

(Essay)
4.9/5
(45)

Once the organization elevates its constraint,its system has no constraint.

(True/False)
4.8/5
(33)