Exam 15: A: Advanced Methods for Project Scheduling
Exam 1: Introduction to Managing Operations Across the Supply Chain40 Questions
Exam 2: Operations and Supply Chain Strategy25 Questions
Exam 3: Managing Processes and Capacity29 Questions
Exam 3: A: Process Mapping and Analysis31 Questions
Exam 4: Productprocess Innovation43 Questions
Exam 5: Manufacturing and Service Process Structures53 Questions
Exam 6: Managing Quality44 Questions
Exam 6: A: Quality Improvement Tools51 Questions
Exam 7: Managing Inventories32 Questions
Exam 8: Lean Systems57 Questions
Exam 9: Customer Service Management59 Questions
Exam 10: Sourcing and Supply Management50 Questions
Exam 11: Logistics Management39 Questions
Exam 12: Demand Planning: Forecasting and Demand Management44 Questions
Exam 13: Sales and Operations Planning36 Questions
Exam 14: Materials and Resource Requirements Planning33 Questions
Exam 15: Project Management34 Questions
Exam 15: A: Advanced Methods for Project Scheduling40 Questions
Exam 16: Sustainable Operations Management Preparing for the Future39 Questions
Select questions type
Which of the following categories of causes would be most appropriate for a Marriott (an international hotel chain)or McDonalds (an international fast food chain)or the local hair stylist?
Free
(Multiple Choice)
5.0/5
(26)
Correct Answer:
C
Which of the following conclusions does the p data shown below support? P = .10
UCL = 0.2022
LCL = 0.-0154


Free
(Multiple Choice)
4.9/5
(36)
Correct Answer:
D
Under what conditions would we be required to recalculate the parameters for an X-bar-R chart?
Free
(Multiple Choice)
4.9/5
(26)
Correct Answer:
C
Which of the following types of control charts would be most appropriate if the data that we are dealing with is binary in nature (good/bad,pass/fail,accept/reject)?
(Multiple Choice)
4.9/5
(32)
Forty samples of 100 are taken,with the total number of defective units being 150.What is the upper control limit of the three sigma (z = 3)p-chart?
(Multiple Choice)
4.7/5
(39)
To determine whether two variables are related to each other you would use:
(Multiple Choice)
4.9/5
(31)
Sample means and ranges were obtained for five samples of 10 units per sample from a production process.Assume the process was considered to be in control during the period these samples were collected.The results are as follows:
What is the central line of the X chart for this process

(Multiple Choice)
4.9/5
(45)
A packaging plant is running a filling process where packages are filled with 24 oz.+/- 0.08 oz.A capability study reveals that the process mean is 24 oz.with a standard deviation of 0.02 oz.What is the capability of the packaging line?
(Multiple Choice)
4.7/5
(32)
The specifications for the diameter of a molded part are 10 mm ± 0.5 mm.The actual average and standard deviation from 250 parts sampled is 10.1 mm and 0.1 mm,respectively.What is the process capability as measured by Cp?
(Multiple Choice)
4.9/5
(32)
Sample means and ranges were obtained for five samples of 10 units per sample from a production process.Assume the process was considered to be in control during the period these samples were collected.The results are as follows:
LCL for the three sigma X chart for the process is approximately (for a sample size of 10,A2 = 0.31):

(Multiple Choice)
4.8/5
(42)
You are given the following data for taillight assemblies:
Management has decided to carry out a Pareto analysis focusing on problem areas.Which of the following conclusions does the Pareto analysis support?

(Multiple Choice)
4.8/5
(31)
Which of the following tools is most appropriate when we are interested in determining if a process that was generating attribute-type data (pass/fail,good/bad)was under control?
(Multiple Choice)
4.9/5
(44)
We are experiencing a problem where the output of a process keeps shifting over time.If we were to use a histogram to collect and display the resulting data,what type of shape would it most likely display?
(Multiple Choice)
4.9/5
(33)
Which of the following conclusions does the p data shown below support? P = .10
UCL = 0.2022
LCL = 0.-0154


(Multiple Choice)
4.9/5
(31)
Which of the following quality improvement tools is not a particularly good brainstorming tool?
(Multiple Choice)
4.8/5
(27)
Measuring quality in brief customer interactions is particularly difficult,as each customer's interaction with a company employee has the potential to be personal and unique.Some service firms have attempted to measure the effectiveness of these transient customer interactions using which of the following scales?
(Multiple Choice)
4.8/5
(32)
A firm has an existing process that it would like to use for producing a part it will sell to an industrial customer.The customer requires that defective (out of specification)parts be kept to 3,000 parts per million (three-tenths of 1 percent)or less.A process capability study done on the process revealed that it has a process capability index (Cpk)of 1.00 for this part.What should the firm conclude from the study?
(Multiple Choice)
4.8/5
(31)
You have been given the following sample information that has been drawn from the last sample taken: Mean of the sample: 13.67
Lower control limit for the range: 0
Upper control limit for the range: 10.6
Observations: 13,12,8,10,11,16,17,8,17,18,20,14
Which of the following conclusions does this data support?
(Multiple Choice)
4.8/5
(36)
Showing 1 - 20 of 40
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)