Exam 15: A: Advanced Methods for Project Scheduling

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Zanda Corp.has determined that it has too many products returned from customers.Zanda is interested in determining what factors or elements could contribute to the large number of returns.Which of the following quality tools would Zanda use to achieve this objective?

(Multiple Choice)
4.8/5
(35)

Which of the following conclusions does the p data shown below support? P = .10 UCL = 0.2022 LCL = 0.-0154 Which of the following conclusions does the p data shown below support? P = .10 UCL = 0.2022 LCL = 0.-0154

(Multiple Choice)
4.8/5
(42)

A process can be said to be capable when:

(Multiple Choice)
4.9/5
(30)

Forty samples of 100 are taken,with the total number of defective units being 150.What is the lower control limit for the three sigma (z = 3)p-chart?"

(Multiple Choice)
4.8/5
(38)

You are given the following data for taillight assemblies: You are given the following data for taillight assemblies:   Which of the following tools does this data represent? Which of the following tools does this data represent?

(Multiple Choice)
4.9/5
(30)

The specifications for the diameter of a molded part are 10 mm ± 0.5 mm.The actual average and standard deviation from 250 parts sampled is 10.1 mm and 0.1 mm,respectively.The process can be characterized as:

(Multiple Choice)
4.8/5
(45)

Hugging in a control chart usually indicates:

(Multiple Choice)
5.0/5
(35)

Suppose that you are a process manager in a manufacturing plant,and you suspect that there is a relationship between the room temperature of the plant and the weights of the plastic caps produced by an injection molding process.What quality improvement tool would you use to investigate this claim?

(Multiple Choice)
4.7/5
(31)

You have been given the following data: Specification information: Anything between 10 and 20 units per order is acceptable. Process Mean: 13 Upper limit of the process: 16 Lower limit of the process: 10 Using this information,which of the following conclusions is most appropriate?

(Multiple Choice)
4.8/5
(37)

Fifteen samples of size 10 are taken from a stable process.The average of the sample means is 32.8,and the average range of the samples is 1.5.What is the upper control limit for the R chart? Use the information contained in the attached chart. Fifteen samples of size 10 are taken from a stable process.The average of the sample means is 32.8,and the average range of the samples is 1.5.What is the upper control limit for the R chart? Use the information contained in the attached chart.

(Multiple Choice)
4.9/5
(42)

Which of the following quality improvement tools is most appropriate for identifying patterns in the data?

(Multiple Choice)
4.8/5
(39)

"Pass/ fail" and "go/no go" are both examples of:

(Multiple Choice)
4.9/5
(34)

A process has been operating very capably with all of its' output falling between the UCL and the LCL.None-the-less,there is some level of variation in the measurements of the output of the process.What is the source of this variation?

(Multiple Choice)
4.7/5
(35)

The width of a histogram showing a distribution of data indicates the __________ of the process that generated the distribution.

(Multiple Choice)
4.8/5
(39)

The objective of statistical process control (SPC)is to:

(Multiple Choice)
4.7/5
(32)

Twenty samples of size 8 were taken from a stable process.From past studies of the process,you know that the overall mean is 42.5 and that the average of the samples range is 2.0.What is the upper control limit for the x-bar chart? Use the information contained in the attached chart to determine your answer. Twenty samples of size 8 were taken from a stable process.From past studies of the process,you know that the overall mean is 42.5 and that the average of the samples range is 2.0.What is the upper control limit for the x-bar chart? Use the information contained in the attached chart to determine your answer.

(Multiple Choice)
4.9/5
(24)

You are involved in the implementation of a quality improvement program.Your immediate goal is to identify what problems you should focus on (ideally you want to focus on those that give you the biggest bang for the buck).Which of the following quality control procedures is the most appropriate?

(Multiple Choice)
4.8/5
(33)

You are given the following data for taillight assemblies: You are given the following data for taillight assemblies:   Management has decided that they must do something about the inability of the taillight assemblies to meet the quality specifications.Yet currently they do not know what areas they should look at.To help management in dealing with this issue,which of the following quality control tools would be most appropriate? Management has decided that they must do something about the inability of the taillight assemblies to meet the quality specifications.Yet currently they do not know what areas they should look at.To help management in dealing with this issue,which of the following quality control tools would be most appropriate?

(Multiple Choice)
4.9/5
(39)

The Taguchi methods link product design to:

(Multiple Choice)
4.8/5
(34)

The specifications for the diameter of a molded part are 10 mm ± 0.5 mm.The actual average and standard deviation from 250 parts sampled is 10.1 mm and 0.1 mm,respectively.What is Cpk?

(Multiple Choice)
4.8/5
(38)
Showing 21 - 40 of 40
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)