Exam 14: Statistical Process Control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A manufacturer of snow shovels sees a drop in the demand for snow shovels due to an unseasonally warm winter.This means that the demand experiences

(Multiple Choice)
4.9/5
(35)

A process that is out of control exhibits ________ variation.

(Short Answer)
4.9/5
(38)

For process control charts,using control limits corresponding to z = 3 standard deviations from the mean will capture what percentage of the random variation in the process?

(Multiple Choice)
4.7/5
(44)

The cost of inspection for three different product characteristics A,B,and C,is $10,$12 and $8 respectively.The cost of failure if any one of them breaks down is $100 (full replacement cost of the product).Where should the priority to inspect first be?

(Multiple Choice)
4.9/5
(38)

On a control chart,________ successive data points on an increasing or decreasing line require an investigation for cause of progressive change.

(Short Answer)
4.9/5
(43)

Graphs designed to signal process workers when nonrandom variation occurs in a process are called ________.

(Short Answer)
4.8/5
(42)

Samples gathered in such a way that every piece of product has an equal chance of being selected for inspection are called

(Multiple Choice)
4.9/5
(30)

Samples gathered in such a way that every piece of product has an equal chance of being selected for inspection are called ________.

(Short Answer)
4.9/5
(42)

Use the information below to answer the following question(s).Use the "Factors for Control Limits" Table A.3 from the textbook where required: Use the information below to answer the following question(s).Use the Factors for Control Limits Table A.3 from the textbook where required:    A control chart needs to be developed to determine if the temperature for a process is within control limits.Five samples each having 4 observations are taken and the sample measurements (temperature in degrees F)are noted in the table below:    -What is the LCL for a R chart? A control chart needs to be developed to determine if the temperature for a process is within control limits.Five samples each having 4 observations are taken and the sample measurements (temperature in degrees F)are noted in the table below: Use the information below to answer the following question(s).Use the Factors for Control Limits Table A.3 from the textbook where required:    A control chart needs to be developed to determine if the temperature for a process is within control limits.Five samples each having 4 observations are taken and the sample measurements (temperature in degrees F)are noted in the table below:    -What is the LCL for a R chart? -What is the LCL for a R chart?

(Multiple Choice)
4.9/5
(29)

For process control charts,to approximately capture 99% of the random variation,the control limits will need to correspond to how many standard deviations from the mean?

(Multiple Choice)
4.8/5
(38)

The control chart used to count the number nonconforming in a consistent sample space is called the ________ chart.

(Short Answer)
4.7/5
(41)

A measurement to determine if a defect is either present or not is known as

(Multiple Choice)
4.8/5
(39)

A control chart needs to be developed to determine if the proportion of late deliveries of a pizza delivery restaurant is within control limits.The control chart which would be most appropriate to use in this situation would be the

(Multiple Choice)
4.8/5
(38)

Each point on the control chart represents data from samples that are plotted sequentially over time.

(True/False)
4.9/5
(35)

A continuous measurement such as weight,height,or volume is known as a ________.

(Short Answer)
4.9/5
(35)

The control chart used to measure the proportion defective is called the ________ chart.

(Short Answer)
4.7/5
(40)

Quality inspection performed during the production process is called ________.

(Short Answer)
4.9/5
(30)

Samples which are ordered by time or sequence are called ________.

(Short Answer)
4.7/5
(37)

Every 10th product coming off a production line is inspected to check for quality.Such a sampling technique is called

(Multiple Choice)
4.9/5
(37)

Samples which are ordered by time or sequence are called

(Multiple Choice)
4.8/5
(28)
Showing 41 - 60 of 80
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)