The distance from the target to the upper specification limit is equal to:

(Multiple Choice)
4.7/5
(42)

The sequence of activities or the flow of materials and information in a process are identified in:

(Multiple Choice)
4.8/5
(37)

In Six Sigma,a problem is defined as a deviation between what should be happening and what actually is happening that is important enough to need correcting.

(True/False)
4.8/5
(31)

The Control phase of DMAIC focuses on how to maintain improvements.

(True/False)
4.9/5
(32)

Which of the following constitutes an operational definition of a service quality measure?

(Multiple Choice)
4.7/5
(37)

The number of defects found in 20 samples of 100 Frost Ice-cream Company flavors taken on a daily basis from a production line over a five-week period is given below.Plot these data on a run chart,computing the average value (center line),and the upper control limit.Do you suspect that any special causes are present? Why? The number of defects found in 20 samples of 100 Frost Ice-cream Company flavors taken on a daily basis from a production line over a five-week period is given below.Plot these data on a run chart,computing the average value (center line),and the upper control limit.Do you suspect that any special causes are present? Why?

(Essay)
4.7/5
(40)

A Six Sigma project might span an entire division or be as narrow as a single production operation.

(True/False)
4.9/5
(36)

Lean production can easily be applied to non-manufacturing environments.

(True/False)
4.7/5
(29)

An achievement which takes an organization to a level of performance not previously attained is called a:

(Multiple Choice)
4.9/5
(27)

A grocery store finds that a patron typically purchases 20 items per visit.In one day,the grocer found that the checkout scanners made 240 price-reading errors in servicing 11,000 patrons.The dpmo is _____.

(Multiple Choice)
4.8/5
(30)

One of the pitfalls experienced in organizations new to Six Sigma is the inability of senior managers to estimate what the resources,they allocate to Six Sigma projects,will "buy" in the way of bottom-line returns.

(True/False)
4.9/5
(33)

_____ focuses on the elimination of waste in all forms,including defects requiring rework,unnecessary processing steps,unnecessary movement of materials or people,waiting time,excess inventory,and overproduction.

(Multiple Choice)
4.9/5
(38)

Which of the following is NOT a characteristic of a Six Sigma project?

(Multiple Choice)
4.9/5
(46)

_____ problems are defined by unsatisfactory performance by a well-specified system.

(Multiple Choice)
4.7/5
(34)

A k-sigma quality level satisfies the equation:

(Multiple Choice)
4.8/5
(38)

Idea gathering is done in the Analyze phase of DMAIC.

(True/False)
4.9/5
(46)

A _____ is a line graph in which data are plotted over time.

(Multiple Choice)
4.8/5
(32)

A delivery process has a target of 5 hours plus or minus one hour.The process standard deviation is estimated as 0.25 hours.The process has a _____ sigma quality level.

(Multiple Choice)
4.9/5
(35)